roadmap: cycle #109 checkpoint — probe complete, Phase 1 kickoff ready

End-of-dogfood checkpoint at cycle #109:

Deliverables:
- PHASE_1_KICKOFF.md (192 lines, execution plan for 6-bundle priority queue)
- Test verification: 564 tests pass, 0 failures
- Branch clean, freeze held, 38 commits total

Probe hypothesis fully validated:
- Multi-flag verbs: 3-4 classifier gaps each
- Single-issue verbs: 0-1 gaps each

Accounting:
- 82 pinpoints filed (cycles #104-#108)
- 67 genuinely open
- 28 doctrines accumulated

Phase 1 ready:
- All 5 priority bundles gaebal-gajae reviewed
- Bundle sequence locked (foundation → extensions → cleanup)
- Expected execution: 50-60 min for all priorities
- No blockers except Phase 0 merge approval

Next: Execute Phase 1 bundles in priority order once Phase 0 lands.
This commit is contained in:
YeonGyu-Kim 2026-04-23 11:56:57 +09:00
parent 66eeed82ca
commit 046bf6cedc

View File

@ -11290,3 +11290,76 @@ claw skills install --bogus-flag
**Branch:** `feat/jobdori-168c-emission-routing` @ 37 commits (freeze held).
**Status:** All unaudited surfaces now probed (cycles #104-#108: plugins, agents, init, bootstrap-plan, system-prompt, export, sandbox, dump-manifests, skills). Phase 1 execution can begin once Phase 0 merges.
---
## Cycle #109 — Phase 0 + Dogfood Complete Checkpoint (2026-04-23 11:48 Seoul)
**Status:** Probe cycles complete. All unaudited surfaces exhausted. Phase 1 kickoff document created + ready for execution.
### What This Cycle Delivered
- ✅ **PHASE_1_KICKOFF.md** — 192-line comprehensive execution plan for 6-bundle priority queue
- Priority 1: Error envelope contract drift (#181/#183)
- Priority 2: CLI contract hygiene sweep (#184/#185)
- Priority 3: Classifier sweep 4-verb (#186/#187/#189/#192)
- Priority 4: USAGE.md audit (#180)
- Priority 5: Dump-manifests help (#188)
- Priority 6+: Independents (#190, #191, others)
- All priority 15 bundles are gaebal-gajae reviewer-blessed
- ✅ **Test verification:** 564 total tests pass (466 unit + 3 integration + 95 output-format), 0 failures
- ✅ **Branch state:** 38 commits, clean working tree, freeze held
### Probe Hypothesis (Fully Validated)
**Multi-flag verbs** (init, bootstrap-plan, system-prompt, export, dump-manifests, skills install): **34 classifier gaps each**
**Single-issue verbs** (list, show, sandbox, agents): **01 gaps**
**Implication for future work:** Prioritize multi-flag verbs in new probes. Single-issue verbs are structurally cleaner.
### Pinpoint Accounting (End of Dogfood)
| Metric | Count | Notes |
|---|---|---|
| Total filed | 82 | Cycles #104#108 inclusive |
| Genuinely open | 67 | (82 - 15 closed/shipped) |
| Classifier family | 19 members | 4 in unknown-option, 4 in filesystem sub-lineages |
| Doc-truthfulness family | 6 members | 2 sub-axes: audit-flow (5) + probe-flow (1) |
| Error envelope family | 2 members | #181/#183 (design decision pending) |
| Install-surface taxonomy | 4 members | #177/#178/#179/#191 |
| Design decisions | 1 member | #190 (help-routing) |
| CI/workflow | 1 member | #175 (gaebal-gajae) |
| Consumer-parity | 1 member | #173 |
### Doctrine Count
**28 doctrines** (added #28 in cycle #107: "first observation is hypothesis")
Key doctrines for Phase 1:
- #22: Schema baseline check before enum proposal
- #25: Contract-surface-first ordering (foundation → extensions → cleanup)
- #27: Same-pattern pinpoints bundle into one classifier sweep
- #28: First observation is hypothesis; verify before filing
### Branch Readiness
**Branch:** `feat/jobdori-168c-emission-routing`
- **Commits:** 38 (4 Phase 0 core + 7 dogfood filings + 1 checkpoint + 12 framework + 9 probe cycles + 4 cycle refinements + 1 Phase 1 kickoff)
- **Tests:** 564 pass, 0 failures, 0 regressions
- **Status:** Frozen (no new code after review guide), doc-only additions
- **Reviewer readiness:** CYCLE_104-105_REVIEW_GUIDE.md + PHASE_1_KICKOFF.md provide full context
### Known Issues (Non-Blockers)
1. Discord message delivery (network timeout in cycle #108) — retry with local notification
2. #190 needs architecture discussion (help-routing design decision)
3. #182 depends on #181 resolution (plugin error envelope)
### Next Action (Once Phase 0 Merges)
Execute Phase 1 bundle sequence (Priority 15 + independents). Target execution time: ~50-60 min for all 5 priority bundles (10 min per bundle, parallel review possible).
---
**End of Phase 0 + Dogfood Cycles. All unaudited surfaces probed. Phase 1 plan locked. Awaiting merge approval for Phase 0.**