diff --git a/ROADMAP.md b/ROADMAP.md index 97ec5ed..c4e2013 100644 --- a/ROADMAP.md +++ b/ROADMAP.md @@ -11363,3 +11363,70 @@ Execute Phase 1 bundle sequence (Priority 1–5 + independents). Target executio --- **End of Phase 0 + Dogfood Cycles. All unaudited surfaces probed. Phase 1 plan locked. Awaiting merge approval for Phase 0.** + +--- + +## Phase 0 / Dogfood Cycle Formal Closure (gaebal-gajae, 2026-04-23 11:58 Seoul) + +**Authoritative closure statement:** + +> **"Phase 0 has finished discovery. Phase 1 should start by landing the locked contract foundation bundle, not by opening new exploratory cycles."** + +### Exhaustion Criteria (All Satisfied) + +1. ✅ **Unaudited surfaces exhaustion:** 9 surfaces probed (plugins, agents, init, bootstrap-plan, system-prompt, export, sandbox, dump-manifests, skills). No more multi-arg verbs remain unprobed. + +2. ✅ **Probe hypothesis validation:** Multi-flag verbs yield 3–4 gaps; single-issue verbs yield 0–1 gaps. Structural pattern confirmed across all 9 probes. + +3. ✅ **Phase 1 documentation:** PHASE_1_KICKOFF.md (192 lines) + CYCLE_104-105_REVIEW_GUIDE.md (204 lines) + reviewer-blessed priority queue (6 bundles). + +4. ✅ **Branch hygiene:** 39 commits, 564 tests pass, 0 regressions, freeze held (doc-only additions). + +### What Closure Means + +**No more new pinpoint filings** on `feat/jobdori-168c-emission-routing`. The branch is now **merge-gated only**. + +**No more probe cycles** on the frozen branch. The next work unit is **execution**, not discovery. + +**Continued work happens on Phase 1 branches** — but those require Phase 0 to merge first. + +### Doctrine #29 (Final) + +**"Discovery termination is itself a deliverable."** + +**Criteria for declaring discovery closed:** +1. All surfaces probed to a defined taxonomy +2. Probe hypothesis validated (pattern identified) +3. Execution plan documented +4. Branch in reviewer-ready state + +**Anti-pattern:** Infinite probe continuation ("there's always more to find") +**Correct pattern:** Explicit closure statement; pivot to execution + +**Validation:** Cycle #109 gaebal-gajae closure. All four criteria met. Discovery formally closed. + +### What Happens Next + +1. **Short-term (minutes–hours):** Merge approval for Phase 0 branch +2. **Medium-term (hours):** Phase 1 branch creation in priority order, bundle-by-bundle execution (~10 min per bundle) +3. **Long-term (days):** Independent fix execution + design decision resolution (#190, #182) + +### Metrics Summary + +| Metric | Value | +|---|---| +| Cycles run | #97 → #109 (13 cycles) | +| Pinpoints filed | 82 (cycles #97–#108) | +| Commits on branch | 39 | +| Tests | 564 pass, 0 fail | +| Doctrines accumulated | 29 (final: "discovery termination is a deliverable") | +| Families + sub-lineages | 7 families, 4 sub-lineages, 1 new sub-axis (probe-flow doc-truth) | +| Reviewer passes | 10+ (gaebal-gajae framing + priority + closure validations) | + +--- + +**END OF PHASE 0 / DOGFOOD CYCLES.** + +**Next action: Phase 0 merge approval, then Phase 1 execution sequence.** + +🪨