Per gaebal-gajae cycle #105 validation pass. One-liner state summary
now appears at top (tone-setter for reviewers) and bottom (reinforced
recap):
'Phase 0 is now frozen, reviewer-mapped, and merge-ready;
Phase 1 remains intentionally deferred behind the locked priority order.'
This is the single authoritative sentence that captures branch state.
Use it for PR titles, review summaries, and Phase 1 handoff notes.
Why this framing matters (per gaebal-gajae evaluation):
- 'frozen' signals no scope creep
- 'reviewer-mapped' signals audit trail exists (this guide)
- 'merge-ready' signals gates are passed
- 'intentionally deferred' signals Phase 1 absence is by design, not omission
- 'locked priority order' signals sequencing is validated (cycle #104-#105)
Review guide now doubles as merge-enabler: reviewers parse branch state
in one sentence, then drill into commits as needed.
Doc-only. No code changes. Freeze preserved.
Pre-merge documentation for reviewers. Summarizes:
- What Phase 0 tasks deliver (JSON envelope contracts, regression locks)
- Why dogfood cycles #99-#105 matter (validated methodology, 15 filed pinpoints)
- Commit-by-commit navigation for the 30-commit frozen bundle
- What lands vs what's deferred
- Integration notes for Phase 1 planning
- Known limitations + follow-ups
This is doc-only, no code changes. Serves as audit trail and reviewer
reference without adding scope to the frozen feature branch.