mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-13 18:00:35 +08:00
docs: record ECC-Tools evaluator corpus merge (#1831)
This commit is contained in:
parent
37c27a60fd
commit
894ee03930
@ -146,6 +146,11 @@ As of 2026-05-12:
|
||||
follow-up backlog items, preserving GitHub object caps while creating or
|
||||
reusing Linear issues when `LINEAR_API_KEY` and `LINEAR_TEAM_ID` are
|
||||
configured.
|
||||
- ECC-Tools PR #40 added a checked-in evaluator/RAG corpus contract covering
|
||||
stale-PR salvage, billing readiness, CI failure diagnosis, harness config
|
||||
quality, AgentShield policy exceptions, skill-quality evidence,
|
||||
deep-analyzer evidence, and RAG/evaluator comparison evidence, with each
|
||||
scenario exercising missing-evidence and evidence-backed diffs.
|
||||
- ECC PR #1803 landed the contributor Quarkus handling branch after maintainer
|
||||
cleanup, current-`main` alignment, full local validation, and preservation of
|
||||
the author's removal of incomplete ja-JP and zh-CN Quarkus translations.
|
||||
@ -199,9 +204,9 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
|
||||
| Articles, tweets, and announcements | X thread, LinkedIn copy, GitHub release copy, push checklist | Draft launch collateral exists under rc.1 release docs | Needs URL-backed refresh |
|
||||
| AgentShield enterprise iteration | Policy gates, SARIF, packs, provenance, corpus, HTML reports, exception lifecycle audit | PRs #53, #55-#62 landed with test evidence | Needs PDF/export decision or next enterprise signal |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog | PRs #26-#39 landed with test evidence | Needs capacity-backed Linear rollout / broader evaluator corpus |
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus | PRs #26-#40 landed with test evidence | Needs capacity-backed Linear rollout |
|
||||
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy and deterministic follow-up checks | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, and PR Review/Salvage Evidence | Partially complete |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md` and `examples/evaluator-rag-prototype/` define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, and deep-analyzer evidence scenarios with trace, report, playbook, and verifier result artifacts | Local corpus complete; hosted integration remains future |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts | Local corpus complete; hosted integration remains future |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit | Needs recurring status updates after each merge batch |
|
||||
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below | Active |
|
||||
| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items | Needs workspace capacity/config rollout |
|
||||
@ -220,9 +225,9 @@ back to the repo evidence and merge commits.
|
||||
| Queue hygiene and salvage | GitHub PR/issue state, salvage ledger | Append ledger entries for any future stale closures | Every cleanup batch |
|
||||
| Release and publication | rc.1 release docs, publication readiness doc | Naming matrix and plugin submission/contact checklist | Before any tag |
|
||||
| Harness OS core | Audit, adapter matrix, observability docs, `ecc2/` | HUD/session-control acceptance spec | Weekly until GA |
|
||||
| Evaluation and RAG | Reference-set validation, harness audit, traces | Read-only evaluator/RAG prototype plus stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, and deep-analyzer evidence fixtures | Use as fixture contract before hosted retrieval/check-run automation |
|
||||
| Evaluation and RAG | Reference-set validation, harness audit, traces, ECC-Tools corpus | Read-only evaluator/RAG prototype plus stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison fixtures | Hosted retrieval/check-run automation plan |
|
||||
| AgentShield enterprise | AgentShield PR evidence and roadmap notes | PDF-export decision or next enterprise signal | After value decision |
|
||||
| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy | Capacity-backed Linear rollout or broader evaluator/RAG corpus slice | Next implementation batch |
|
||||
| ECC Tools app | ECC-Tools PR evidence, billing audit, risk taxonomy, evaluator/RAG corpus | Capacity-backed Linear rollout | Next implementation batch |
|
||||
| Linear progress | Linear project status updates and this mirror | Status update with queue/evidence/missing gates | Every significant merge batch |
|
||||
|
||||
The project status update should always include:
|
||||
@ -378,6 +383,10 @@ Acceptance:
|
||||
- RAG/evaluator follow-ups flag retrieval, embedding, ranking, and evaluator
|
||||
changes that lack reference-set comparison, golden trace, benchmark, fixture,
|
||||
or eval-run evidence.
|
||||
- Evaluator/RAG corpus contract mirrors the local prototype scenarios into
|
||||
ECC-Tools fixtures and tests for stale-PR salvage, billing readiness,
|
||||
CI failure diagnosis, harness config quality, AgentShield policy exceptions,
|
||||
skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison.
|
||||
- PR review/stale-salvage follow-ups flag review, triage, stale-closure, and
|
||||
pull-request automation changes that lack stale-salvage fixtures,
|
||||
reviewer-thread cases, or reopen-flow reference evidence.
|
||||
@ -419,6 +428,6 @@ Acceptance:
|
||||
executive report, corpus benchmark output, and exception lifecycle audit.
|
||||
2. Enable/configure the merged Linear backlog sync path after workspace issue
|
||||
capacity clears or the Linear workspace is upgraded.
|
||||
3. Consume the local evaluator/RAG corpus from ECC Tools before adding hosted
|
||||
retrieval, vector storage, model-backed judging, or automated check-run
|
||||
promotion.
|
||||
3. Use the ECC-Tools evaluator/RAG corpus as the promotion gate before adding
|
||||
hosted retrieval, vector storage, model-backed judging, or automated
|
||||
check-run promotion.
|
||||
|
||||
Loading…
x
Reference in New Issue
Block a user