docs: sync may 19 linear readiness evidence

This commit is contained in:
Affaan Mustafa 2026-05-19 10:48:42 -04:00 committed by Affaan Mustafa
parent c7d662c3c6
commit ac7434ea8f
6 changed files with 48 additions and 26 deletions

View File

@ -51,8 +51,9 @@ As of 2026-05-19:
now at 0 open PRs and 0 open issues by live `gh search`. Archived repos now at 0 open PRs and 0 open issues by live `gh search`. Archived repos
touched during closure were restored to archived state. touched during closure were restored to archived state.
- GitHub discussions are current across those tracked repos: - GitHub discussions are current across those tracked repos:
`affaan-m/ECC` has 58 total discussions and 0 without `affaan-m/ECC` has 59 total discussions and 0 without
maintainer touch after May 15 maintainer updates on #73 and #1239; AgentShield, maintainer touch after the May 19 #2003 AURA integration proposal was routed
as an external-adapter proposal, not core wallet/escrow coupling; AgentShield,
JARVIS, ECC Tools, and the ECC Tools website have discussions disabled or 0 JARVIS, ECC Tools, and the ECC Tools website have discussions disabled or 0
total discussions. `docs/architecture/discussion-response-playbook.md` now total discussions. `docs/architecture/discussion-response-playbook.md` now
supplies the ITO-59 response categories, public templates, security-escalation supplies the ITO-59 response categories, public templates, security-escalation
@ -61,12 +62,17 @@ As of 2026-05-19:
`ITO-59`) and five milestones: Security and Access Baseline, ECC 2.0 Preview `ITO-59`) and five milestones: Security and Access Baseline, ECC 2.0 Preview
and Publication, AgentShield Enterprise Iteration, ECC Tools Next-Level and Publication, AgentShield Enterprise Iteration, ECC Tools Next-Level
Platform, and Legacy Audit and Salvage. Platform, and Legacy Audit and Salvage.
- Linear live sync is current for the May 18 merge and supply-chain batch: - Linear live sync is current for the May 19 PR #2002 merge and discussion
ITO-57 has a final emergency supply-chain refresh comment batch: the ECC platform project has the post-PR #2002 sync document
(`3fe5b2b7-c4fe-401c-a317-b40d72119cb3`), and the ECC platform project has `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment
the latest operator progress comment (`e32e5b7a-287b-4bf4-9ed7-314389a157e1`). `a6411e3a-8c8e-4a58-adba-687e77d4c543`, and issue comments on ITO-44,
Linear project status updates are disabled in this workspace, so the project ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56. ITO-47, ITO-48,
comment is the supported external status surface. ITO-49, ITO-51, ITO-54, and ITO-56 were moved to In Progress because those
lanes now have current implementation/evidence and remaining gate/readback
work. ITO-57 still has the May 18 emergency supply-chain refresh comment
(`3fe5b2b7-c4fe-401c-a317-b40d72119cb3`). Linear project status updates are
disabled in this workspace, so project documents and comments are the
supported external status surface.
- The latest May 18 merge batch on `main` includes PR #1970 workflow-security - The latest May 18 merge batch on `main` includes PR #1970 workflow-security
validator bypass fixes, PR #1971 metrics bridge cost-reporting and warning validator bypass fixes, PR #1971 metrics bridge cost-reporting and warning
de-dup fixes, PR #1972 `uncloud` skill activation structure, PR #1976 de-dup fixes, PR #1972 `uncloud` skill activation structure, PR #1976
@ -79,9 +85,11 @@ As of 2026-05-19:
current May 19 queue-zero state, canonical ECC identity merge, release video current May 19 queue-zero state, canonical ECC identity merge, release video
suite gate, partner/sponsor/talk outreach pack, owner approval packet suite gate, partner/sponsor/talk outreach pack, owner approval packet
(`owner-approval-packet-2026-05-19.md`), preview-pack smoke digest (`owner-approval-packet-2026-05-19.md`), preview-pack smoke digest
`790430aef4a8`, local 2550-test suite, PR #2001 merge, and GitHub Actions run `790430aef4a8`, local 2550-test suite, PR #2001 merge and GitHub Actions run
`26102500291` success. The May 18 evidence remains the detailed supply-chain `26102500291` success, plus PR #2002's owner-approval dashboard gate refresh,
and publication-path snapshot. GitHub Actions run `26103853507`, and the May 19 Linear sync document. The
May 18 evidence remains the detailed supply-chain and publication-path
snapshot.
- `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` - `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md`
regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit
evidence: PR queue, issue queue, discussion queue, local worktree gate, evidence: PR queue, issue queue, discussion queue, local worktree gate,
@ -734,12 +742,12 @@ is not complete unless the evidence column exists and has been freshly verified.
| Prompt requirement | Required artifact or gate | Current evidence | Status | | Prompt requirement | Required artifact or gate | Current evidence | Status |
| --- | --- | --- | --- | | --- | --- | --- | --- |
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after merging PR #2001 and refreshing platform audit evidence | Complete | | Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after merging PR #2002 and refreshing platform audit evidence | Complete |
| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after the live platform audit refresh | Complete | | Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after the live platform audit refresh | Complete |
| Manage repository discussions | Repo-family discussion recheck plus response playbook | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk still has 58 total discussions; `docs/architecture/discussion-response-playbook.md` distinguishes support, maintainer coordination, stale/concluded, release, informational, and security-sensitive response paths | Complete | | Manage repository discussions | Repo-family discussion recheck plus response playbook | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk has 59 total discussions after #2003 was routed with a maintainer response; `docs/architecture/discussion-response-playbook.md` distinguishes support, maintainer coordination, stale/concluded, release, informational, and security-sensitive response paths | Complete |
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2001 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, and owner-approval packet batch; no open tracked PRs remain | Complete | | Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2002 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, owner-approval packet, and owner-approval dashboard gate batch; no open tracked PRs remain | Complete |
| Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` plus `docs/legacy-artifact-inventory.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass; #1687, #1609, #1563, #1564, and #1565 localization tails are attached to Linear ITO-55 for language-owner review and no automatic import remains release-blocking | Complete; repeat legacy scan before release | | Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` plus `docs/legacy-artifact-inventory.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass; #1687, #1609, #1563, #1564, and #1565 localization tails are attached to Linear ITO-55 for language-owner review and no automatic import remains release-blocking | Complete; repeat legacy scan before release |
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2550-test suite, PR #2001 merge, GitHub Actions run `26102500291` success, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, and preview-pack smoke digest `790430aef4a8` | Needs final release approval | | ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2550-test suite, PR #2001 merge and GitHub Actions run `26102500291`, PR #2002 owner-approval dashboard gate refresh and GitHub Actions run `26103853507`, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, and preview-pack smoke digest `790430aef4a8` | Needs final release approval |
| Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review | | Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review |
| Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work | | Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work |
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission | | Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
@ -748,7 +756,7 @@ is not complete unless the evidence column exists and has been freshly verified.
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, hosted promotion judge audit trace, payment-announcement readiness, billing announcement preflight, aggregate production billing KV readback, Marketplace webhook provenance, target-account billing readback, Marketplace-source provenance counts, AgentShield fleet-summary hosted routing, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output hosted telemetry, and operator-visible promotion output values | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, hosted promotion judge request fingerprints plus allowed-citation audit trails, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` plus `--preflight` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, hosted harness findings that route AgentShield fleet target paths to harness owners, ECC-Tools commit `8658951` routing AgentShield policy-promotion Action outputs into hosted security review and promotion-readiness scoring, ECC-Tools commit `16c537f` rendering policy-promotion status/pack/count/digest values directly in hosted security job comments/check-runs, ECC-Tools commit `05d4e82` rendering model-judge audit traces without exposing raw provider output, ECC-Tools commit `91a441b` adding the safe billing announcement preflight path, ECC-Tools commit `eb69412` recording the initial production readback state, ECC-Tools commit `95d0bec` adding `npm run billing:kv-readback` with aggregate account-billing and billing-state records but 0 Marketplace Pro billing-state records, ECC-Tools commit `2859678` requiring webhook-derived Marketplace provenance before announcement readiness, ECC-Tools commit `42653f9` adding Wrangler OAuth readback, ECC-Tools commit `632e059` adding sanitized target-account readback that requires both target key families before `--require-ready` can pass, and ECC-Tools commit `d5f60db` adding sanitized Marketplace plan/action provenance counts; the latest 2026-05-18 live Wrangler OAuth recheck found 256 account-billing records, 256 billing-state records, 197 Marketplace-source records, 4 Marketplace webhook-provenance records, all `Open Source`, and 0 Marketplace Pro records, then updated Linear ITO-61 with the data/provisioning blocker | Next work is create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure target account plus `INTERNAL_API_SECRET`, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate | | ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, hosted promotion judge audit trace, payment-announcement readiness, billing announcement preflight, aggregate production billing KV readback, Marketplace webhook provenance, target-account billing readback, Marketplace-source provenance counts, AgentShield fleet-summary hosted routing, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output hosted telemetry, and operator-visible promotion output values | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, hosted promotion judge request fingerprints plus allowed-citation audit trails, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` plus `--preflight` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, hosted harness findings that route AgentShield fleet target paths to harness owners, ECC-Tools commit `8658951` routing AgentShield policy-promotion Action outputs into hosted security review and promotion-readiness scoring, ECC-Tools commit `16c537f` rendering policy-promotion status/pack/count/digest values directly in hosted security job comments/check-runs, ECC-Tools commit `05d4e82` rendering model-judge audit traces without exposing raw provider output, ECC-Tools commit `91a441b` adding the safe billing announcement preflight path, ECC-Tools commit `eb69412` recording the initial production readback state, ECC-Tools commit `95d0bec` adding `npm run billing:kv-readback` with aggregate account-billing and billing-state records but 0 Marketplace Pro billing-state records, ECC-Tools commit `2859678` requiring webhook-derived Marketplace provenance before announcement readiness, ECC-Tools commit `42653f9` adding Wrangler OAuth readback, ECC-Tools commit `632e059` adding sanitized target-account readback that requires both target key families before `--require-ready` can pass, and ECC-Tools commit `d5f60db` adding sanitized Marketplace plan/action provenance counts; the latest 2026-05-18 live Wrangler OAuth recheck found 256 account-billing records, 256 billing-state records, 197 Marketplace-source records, 4 Marketplace webhook-provenance records, all `Open Source`, and 0 Marketplace Pro records, then updated Linear ITO-61 with the data/provisioning blocker | Next work is create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure target account plus `INTERNAL_API_SECRET`, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate |
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future | | GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated | | Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated |
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; the May 18 sync adds queue-zero/work-items state, #1970/#1971/#1972/#1976 merge evidence, ITO-57 current-head supply-chain refresh comment `0b9931b9-1556-4ebc-a70c-f3635557625d`, ITO-57 defensive-deny scanner recheck reply `6fa15367-d994-4e53-ade3-9462477e1100`, ECC platform progress comment `e32e5b7a-287b-4bf4-9ed7-314389a157e1`, and generated `operator:dashboard` prompt-to-artifact audit for recurring status updates | Needs recurring status updates after each significant merge batch | | Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists and issue creation works again; the May 19 sync adds post-PR #2002 document `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`, ITO-44/47/48/49/51/54/56 issue comments, and In Progress state for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56 | Needs recurring status updates after each significant merge batch |
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active | | Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
| Realtime Linear sync | Project comments while issue/status capacity is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked; May 18 live connector comments were posted to ITO-57 and the ECC platform project after project status updates returned disabled | Needs workspace capacity/config rollout for productized issue sync | | Realtime Linear sync | Project comments while issue/status capacity is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked; May 18 live connector comments were posted to ITO-57 and the ECC platform project after project status updates returned disabled | Needs workspace capacity/config rollout for productized issue sync |
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate | | Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |

View File

@ -2,8 +2,8 @@
This dashboard is generated by `npm run operator:dashboard`. It is an operator snapshot, not release approval. This dashboard is generated by `npm run operator:dashboard`. It is an operator snapshot, not release approval.
Generated: 2026-05-19T14:27:11.558Z Generated: 2026-05-19T14:47:22.463Z
Commit: a11bad8a7ad5bb028eb884913abf20285aec01d1 Commit: c7d662c3c68719e5ef0b5305ca3f6782b3214224
Status: work remaining Status: work remaining
## Current Status ## Current Status
@ -44,7 +44,7 @@ Growth lanes: GitHub Sponsors and OSS partner sponsors; ECC Tools Pro subscripti
| Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield policy promotion `reviewItems` landed in `87aec47`; package-manager hardening drift detection landed in `28d08c7`; workflow action runtime pins were refreshed in `659f569`; npm age-gate guidance was corrected in `ee585cd`; package-manager hardening Action outputs landed in `1124535`; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in `1593925`; fleet review ticket payloads and current Mini Shai-Hulud IOC breadcrumbs landed in `840952a`; ECC-Tools consumes those outputs in `8658951`, surfaces operator-readable status/pack/count/digest telemetry in `16c537f`, and renders hosted promotion judge audit traces in `05d4e82`; all are mirrored in the GA roadmap | deepen live operator approval/readback after Marketplace/payment gates | | Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield policy promotion `reviewItems` landed in `87aec47`; package-manager hardening drift detection landed in `28d08c7`; workflow action runtime pins were refreshed in `659f569`; npm age-gate guidance was corrected in `ee585cd`; package-manager hardening Action outputs landed in `1124535`; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in `1593925`; fleet review ticket payloads and current Mini Shai-Hulud IOC breadcrumbs landed in `840952a`; ECC-Tools consumes those outputs in `8658951`, surfaces operator-readable status/pack/count/digest telemetry in `16c537f`, and renders hosted promotion judge audit traces in `05d4e82`; all are mirrored in the GA roadmap | deepen live operator approval/readback after Marketplace/payment gates |
| Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, billing announcement preflight, aggregate production billing KV readback, Wrangler OAuth readback, target-account billing readback, provenance-aware Marketplace billing-state gates, sanitized Marketplace plan/action provenance counts, hosted team-learning feedback controls, and ECC-Tools Dependabot alert remediation are mirrored in the GA roadmap | create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure the target account and INTERNAL_API_SECRET, then rerun target readback and the live announcement gate | | Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, billing announcement preflight, aggregate production billing KV readback, Wrangler OAuth readback, target-account billing readback, provenance-aware Marketplace billing-state gates, sanitized Marketplace plan/action provenance counts, hosted team-learning feedback controls, and ECC-Tools Dependabot alert remediation are mirrored in the GA roadmap | create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure the target account and INTERNAL_API_SECRET, then rerun target readback and the live announcement gate |
| Audit, prune, or attach legacy work | docs/stale-pr-salvage-ledger.md and legacy inventory | current | legacy salvage ledger and inventory are current; all localization tails are attached to Linear ITO-55 for manual language-owner review | repeat legacy scan before release | | Audit, prune, or attach legacy work | docs/stale-pr-salvage-ledger.md and legacy inventory | current | legacy salvage ledger and inventory are current; all localization tails are attached to Linear ITO-55 for manual language-owner review | repeat legacy scan before release |
| Keep Linear roadmap detailed and progress tracking synchronized | Linear project mirror plus progress-sync contract | current | Linear live sync and project progress surface are current; progress-sync contract defines the file-backed work-items/status path | repeat Linear/project status update and local work-items sync after each significant merge batch | | Keep Linear roadmap detailed and progress tracking synchronized | Linear project mirror plus progress-sync contract | current | Linear live sync is current with the May 19 post-PR #2002 sync document, project comment, and active issue-lane updates; progress-sync contract defines the file-backed work-items/status path | repeat Linear/project status update and local work-items sync after each significant merge batch |
| Provide ECC 2.0 observability for self-use | observability readiness gate | complete | observability:ready command and readiness doc exist | runtime/dashboard implementation can continue after release gates | | Provide ECC 2.0 observability for self-use | observability readiness gate | complete | observability:ready command and readiness doc exist | runtime/dashboard implementation can continue after release gates |
| Keep Mini Shai-Hulud/TanStack protection loop current | supply-chain watch plus runbook plus AgentShield package-manager hardening | current | scheduled supply-chain watch emits IOC/advisory-source refresh artifacts; ECC scanner covers gh-token-monitor token-store persistence; AgentShield now detects known AI-tool persistence IOCs, npm lifecycle/token drift, unsupported npm age-key drift, and pnpm/Yarn cooldown drift; current-head watch evidence and ITO-57 May 18 Linear evidence updates are current | repeat advisory/source refresh and Linear sync after each significant supply-chain batch | | Keep Mini Shai-Hulud/TanStack protection loop current | supply-chain watch plus runbook plus AgentShield package-manager hardening | current | scheduled supply-chain watch emits IOC/advisory-source refresh artifacts; ECC scanner covers gh-token-monitor token-store persistence; AgentShield now detects known AI-tool persistence IOCs, npm lifecycle/token drift, unsupported npm age-key drift, and pnpm/Yarn cooldown drift; current-head watch evidence and ITO-57 May 18 Linear evidence updates are current | repeat advisory/source refresh and Linear sync after each significant supply-chain batch |

View File

@ -25,7 +25,7 @@ surfaces, or posting announcements.
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` | Current May 16/17 queue cleanup, recsys skill merge, GateGuard triage, PR #1947 supply-chain protection, AgentShield #87 plugin-cache confidence evidence, AgentShield #88 evidence-pack inspect/readback, AgentShield #89 evidence-pack fleet routing, AgentShield #90 fleet review items, AgentShield #91 policy export, AgentShield #92 policy promotion, ECC-Tools #76 fleet-summary consumption, ECC-Tools #77 hosted finding evidence paths, ECC-Tools #78 harness policy-route linking, dashboard refresh, and combined Node/Rust/release-surface gate evidence through the May 16 mirror | Must still be repeated from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` | Current May 16/17 queue cleanup, recsys skill merge, GateGuard triage, PR #1947 supply-chain protection, AgentShield #87 plugin-cache confidence evidence, AgentShield #88 evidence-pack inspect/readback, AgentShield #89 evidence-pack fleet routing, AgentShield #90 fleet review items, AgentShield #91 policy export, AgentShield #92 policy promotion, ECC-Tools #76 fleet-summary consumption, ECC-Tools #77 hosted finding evidence paths, ECC-Tools #78 harness policy-route linking, dashboard refresh, and combined Node/Rust/release-surface gate evidence through the May 16 mirror | Must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` | May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack protection recheck, npm audit/signature checks, legacy and Linear progress routing, deterministic preview-pack smoke, operator dashboard refresh, Linear sync, and GitHub CI evidence for `27dc2918` | Superseded by the May 18 evidence snapshot; repeat from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` | May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack protection recheck, npm audit/signature checks, legacy and Linear progress routing, deterministic preview-pack smoke, operator dashboard refresh, Linear sync, and GitHub CI evidence for `27dc2918` | Superseded by the May 18 evidence snapshot; repeat from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-18.md` | May 18 queue-zero state, #1970/#1971/#1972 merge batch, #1978 review/closure, supply-chain recheck, AgentShield evidence mirror, Linear sync, current-head CI/security scan success for `4470e2e6`, and ITO-46 naming/plugin publication closure | Superseded by the May 19 ECC identity, video, and growth evidence snapshot | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-18.md` | May 18 queue-zero state, #1970/#1971/#1972 merge batch, #1978 review/closure, supply-chain recheck, AgentShield evidence mirror, Linear sync, current-head CI/security scan success for `4470e2e6`, and ITO-46 naming/plugin publication closure | Superseded by the May 19 ECC identity, video, and growth evidence snapshot |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, May 19 operator dashboard, preview-pack smoke digest `790430aef4a8`, 2550-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, and PR #2001 owner approval packet CI success | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, May 19 operator dashboard, preview-pack smoke digest `790430aef4a8`, 2550-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, PR #2001 owner approval packet CI success, PR #2002 owner-approval dashboard gate CI success, and the May 19 Linear sync document | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 18 generated dashboard | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 18 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 19 generated dashboard | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 19 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Current prompt-to-artifact operator dashboard | Shows PR/issue/discussion/platform/supply-chain gates current and adds the current `$1,728/mo` to `$10,000/mo` hypergrowth, video owner-approval, and outbound-pack operating lanes | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Current prompt-to-artifact operator dashboard | Shows PR/issue/discussion/platform/supply-chain gates current and adds the current `$1,728/mo` to `$10,000/mo` hypergrowth, video owner-approval, and outbound-pack operating lanes |

View File

@ -8,9 +8,9 @@ social announcement.
| Field | Evidence | | Field | Evidence |
| --- | --- | | --- | --- |
| Upstream main | `8148340ad14eb32c971346f0cb4cb9431ec0f5de` | | Upstream main | `c7d662c3c68719e5ef0b5305ca3f6782b3214224` |
| Git remote | `https://github.com/affaan-m/ECC.git` | | Git remote | `https://github.com/affaan-m/ECC.git` |
| Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, and PR #2001 owner approval packet addition | | Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, and PR #2002 owner approval dashboard gate refresh |
| Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe | | Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe |
The release operator must repeat all publish-facing checks from the exact final The release operator must repeat all publish-facing checks from the exact final
@ -23,7 +23,7 @@ release commit with a strictly clean checkout before publishing.
| Platform audit | `node scripts/platform-audit.js --json` | Ready true; tracked repos report 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, 0 conflicting PRs, and 0 blocking dirty files | | Platform audit | `node scripts/platform-audit.js --json` | Ready true; tracked repos report 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, 0 conflicting PRs, and 0 blocking dirty files |
| Trunk PRs | `gh pr list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` | | Trunk PRs | `gh pr list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` |
| Trunk issues | `gh issue list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` | | Trunk issues | `gh issue list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` |
| Discussion audit through platform audit | `node scripts/platform-audit.js --json` | `affaan-m/ECC` discussions enabled; 58 sampled; 0 needing maintainer touch; 0 answerable without accepted answer | | Discussion audit through platform audit | `node scripts/platform-audit.js --json` | `affaan-m/ECC` discussions enabled; 59 sampled after #2003 AURA integration proposal; 0 needing maintainer touch; 0 answerable without accepted answer |
| Worktree | `git status --short --branch` | `## main...origin/main` | | Worktree | `git status --short --branch` | `## main...origin/main` |
Tracked repositories in the platform audit were: Tracked repositories in the platform audit were:
@ -50,6 +50,7 @@ Tracked repositories in the platform audit were:
| PR #1999 | Merged the operator dashboard refresh that moved the release video suite to current once publish-candidate evidence was recorded | | PR #1999 | Merged the operator dashboard refresh that moved the release video suite to current once publish-candidate evidence was recorded |
| PR #2000 | Merged the suite-count evidence refresh so the platform audit rejects stale local-suite totals | | PR #2000 | Merged the suite-count evidence refresh so the platform audit rejects stale local-suite totals |
| PR #2001 | Merged the final human decision sheet for release, package, plugin, video, billing, social, and outbound approvals; GitHub Actions run `26102500291` completed successfully | | PR #2001 | Merged the final human decision sheet for release, package, plugin, video, billing, social, and outbound approvals; GitHub Actions run `26102500291` completed successfully |
| PR #2002 | Merged the owner-approval dashboard refresh so the operator dashboard fails closed when the final decision sheet is missing or incomplete; CI passed before merge |
## Release And Growth Evidence ## Release And Growth Evidence
@ -57,12 +58,14 @@ Tracked repositories in the platform audit were:
| --- | --- | --- | | --- | --- | --- |
| Release-surface tests | `node tests/docs/ecc2-release-surface.test.js` | 27 passed, 0 failed | | Release-surface tests | `node tests/docs/ecc2-release-surface.test.js` | 27 passed, 0 failed |
| Preview-pack smoke | `npm run preview-pack:smoke -- --format json` | Ready true; digest `790430aef4a8`; 31 required artifacts; 5 passed, 0 failed | | Preview-pack smoke | `npm run preview-pack:smoke -- --format json` | Ready true; digest `790430aef4a8`; 31 required artifacts; 5 passed, 0 failed |
| Operator dashboard | `npm run operator:dashboard -- --markdown --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Generated May 19 dashboard with platform audit ready true, 0 tracked PRs, 0 tracked issues, 0 discussion gaps, `$1,728/mo` current MRR, `$10,000/mo` target MRR, the release video suite marked current, and top actions for plugin publication, notifications, outbound approval, AgentShield, and ECC Tools billing | | Operator dashboard | `npm run operator:dashboard -- --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Regenerated from `c7d662c3c68719e5ef0b5305ca3f6782b3214224` with platform audit ready true, 0 tracked PRs, 0 tracked issues, 0 discussion gaps, `$1,728/mo` current MRR, `$10,000/mo` target MRR, the release video suite marked current, and top actions for plugin publication, notifications, outbound approval, AgentShield, and ECC Tools billing |
| Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB | | Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB |
| Full local suite | `node tests/run-all.js` | 2550 passed, 0 failed | | Full local suite | `node tests/run-all.js` | 2550 passed, 0 failed |
| PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix | | PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix |
| PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge | | PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge |
| PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge | | PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge |
| PR #2002 CI | GitHub Actions run `26103853507` | Completed successfully before merge; required checks passed, Cubic remained non-blocking, and PR #2002 merged into `main` as `c7d662c3c68719e5ef0b5305ca3f6782b3214224` |
| Linear sync | Linear document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` plus project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543` | Project and issue lanes now record PR #2002 evidence, discussion #2003 routing, owner-approval dashboard gate, and In Progress status for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56 |
| Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed | | Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed |
| Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed | | Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed |
@ -77,6 +80,7 @@ Tracked repositories in the platform audit were:
| Owner approval proof | `owner-approval-packet-2026-05-19.md` centralizes release, package, plugin, video, billing, social, and outbound decision gates | | Owner approval proof | `owner-approval-packet-2026-05-19.md` centralizes release, package, plugin, video, billing, social, and outbound decision gates |
| Business baseline | Hypergrowth command center and partner pack use `$1,728/mo` current MRR, `$10,000/mo` target MRR, and `$8,272/mo` gap | | Business baseline | Hypergrowth command center and partner pack use `$1,728/mo` current MRR, `$10,000/mo` target MRR, and `$8,272/mo` gap |
| Operator dashboard | `operator-readiness-dashboard-2026-05-19.md` pulls the growth baseline into the same queue, publication, video, outbound, AgentShield, ECC Tools, Linear, and supply-chain control surface | | Operator dashboard | `operator-readiness-dashboard-2026-05-19.md` pulls the growth baseline into the same queue, publication, video, outbound, AgentShield, ECC Tools, Linear, and supply-chain control surface |
| Linear progress proof | Linear project document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` mirrors the post-PR #2002 state and records active lanes for launch materials, AgentShield, ECC Tools deep analysis, observability, and final release publication |
## Current Publication Blockers ## Current Publication Blockers
@ -102,7 +106,7 @@ Tracked repositories in the platform audit were:
The tracked public PR queue, issue queue, discussion queue, canonical ECC The tracked public PR queue, issue queue, discussion queue, canonical ECC
identity, release video suite, preview pack, and growth outreach packet are identity, release video suite, preview pack, and growth outreach packet are
current on May 19, 2026 for `main` through current on May 19, 2026 for `main` through
`e7a7b2aaa33c0657cad9db3fa2ced0e636cd0f8c`. The remaining video work is `c7d662c3c68719e5ef0b5305ca3f6782b3214224`. The remaining video work is
owner approval, upload, and public URL attachment, not render or QA production. owner approval, upload, and public URL attachment, not render or QA production.
This improves publication readiness but does not replace the approval-gated This improves publication readiness but does not replace the approval-gated

View File

@ -458,9 +458,12 @@ function supplyChainLocalProtectionGap({ roadmap, scripts }) {
function hasCurrentLinearProgressSync({ roadmap, progressSync }) { function hasCurrentLinearProgressSync({ roadmap, progressSync }) {
const hasOperatorProgressSurface = roadmap.includes('operator progress snapshot') const hasOperatorProgressSurface = roadmap.includes('operator progress snapshot')
|| roadmap.includes('operator progress comment'); || roadmap.includes('operator progress comment');
const hasMay19ProgressSurface = roadmap.includes('ecc-may-19-post-pr-2002-sync-64cef8f668e0')
&& roadmap.includes('a6411e3a-8c8e-4a58-adba-687e77d4c543')
&& roadmap.includes('ITO-56');
return roadmap.includes('Linear live sync is current') return roadmap.includes('Linear live sync is current')
&& hasOperatorProgressSurface && (hasOperatorProgressSurface || hasMay19ProgressSurface)
&& includesAll(progressSync, [ && includesAll(progressSync, [
'node scripts/work-items.js sync-github --repo <owner/repo>', 'node scripts/work-items.js sync-github --repo <owner/repo>',
'node scripts/status.js --json', 'node scripts/status.js --json',
@ -483,6 +486,10 @@ function linearProgressStatus(context) {
function linearProgressEvidence(context) { function linearProgressEvidence(context) {
if (hasCurrentLinearProgressSync(context)) { if (hasCurrentLinearProgressSync(context)) {
if (context.roadmap.includes('ecc-may-19-post-pr-2002-sync-64cef8f668e0')) {
return 'Linear live sync is current with the May 19 post-PR #2002 sync document, project comment, and active issue-lane updates; progress-sync contract defines the file-backed work-items/status path';
}
return 'Linear live sync and project progress surface are current; progress-sync contract defines the file-backed work-items/status path'; return 'Linear live sync and project progress surface are current; progress-sync contract defines the file-backed work-items/status path';
} }

View File

@ -259,6 +259,9 @@ test('GA roadmap mirrors the current May 19 release evidence', () => {
'local 2550-test suite', 'local 2550-test suite',
'PR #2001', 'PR #2001',
'GitHub Actions run `26102500291`', 'GitHub Actions run `26102500291`',
'PR #2002',
'GitHub Actions run `26103853507`',
'ecc-may-19-post-pr-2002-sync-64cef8f668e0',
'owner approval packet', 'owner approval packet',
]) { ]) {
assert.ok(roadmap.includes(marker), `GA roadmap missing current evidence marker ${marker}`); assert.ok(roadmap.includes(marker), `GA roadmap missing current evidence marker ${marker}`);