docs: mirror ECC 2.0 GA roadmap

This commit is contained in:
Affaan Mustafa 2026-05-12 00:44:16 -04:00 committed by Affaan Mustafa
parent e17f2bcb1b
commit df6078ed1e
3 changed files with 187 additions and 0 deletions

183
docs/ECC-2.0-GA-ROADMAP.md Normal file
View File

@ -0,0 +1,183 @@
# ECC 2.0 GA Roadmap
This roadmap is the durable repo mirror for the Linear project:
<https://linear.app/ecctools/project/ecc-20-ga-harness-os-security-platform-de2a0ecace6f>
Linear issue creation is currently blocked by the workspace active issue limit,
so the live execution truth is split across:
- the Linear project description, status updates, and milestones;
- this repo document;
- merged PR evidence;
- handoffs under `~/.cluster-swarm/handoffs/`.
## Current Evidence
As of 2026-05-12:
- Public GitHub queues are clean across `everything-claude-code`,
`agentshield`, `JARVIS`, `ECC-Tools`, and `ECC-website`.
- `npm run harness:audit -- --format json` reports 70/70 on current `main`.
- `npm run observability:ready` reports 14/14 readiness on current `main`.
- AgentShield PR #53 reduced two context-rule false positives and closed the
remaining AgentShield issues.
- ECC PR #1778 recovered the useful stale #1413 network/homelab architect-agent
concepts.
## Operating Rules
- Keep public PRs and issues below 20, with zero as the preferred release-lane
target.
- Maintain 70/70 harness audit and 14/14 observability readiness after every
GA-readiness batch.
- Do not publish release or social announcements until the GitHub release,
npm/package state, billing state, and plugin submission surfaces are verified
with fresh evidence.
- Do not treat closed stale PRs as discarded. Inspect them, port useful current
compatible work on maintainer-owned branches, and credit the source PR.
- Do not create new Linear issues until the active issue limit is cleared.
## Reference Pressure
The GA roadmap is informed by these reference surfaces:
- `stablyai/orca` and `superset-sh/superset` for worktree-native parallel agent
UX, review loops, and workspace presets.
- `standardagents/dmux` and `aidenybai/ghast` for terminal/worktree
multiplexing, session grouping, and lifecycle hooks.
- `jarrodwatts/claude-hud` for always-visible status, tool, agent, todo, and
context telemetry.
- `stanford-iris-lab/meta-harness` and `greyhaven-ai/autocontext` for
evaluation-driven harness improvement, traces, playbooks, and promotion
loops.
- `NousResearch/hermes-agent` for operator shell, gateway, memory, skills, and
multi-platform command patterns.
- `anthropics/claude-code`, active `sst/opencode` / `anomalyco/opencode`, Zed,
Codex, Cursor, Gemini, and terminal-only workflows for adapter expectations.
The output of this reference work should be concrete ECC deltas, not a second
strategy memo.
## Milestones
### 1. GA Release, Naming, And Plugin Publication Readiness
Target: 2026-05-24
Acceptance:
- Naming matrix covers product name, npm package, Claude plugin, Codex plugin,
OpenCode package, marketplace metadata, docs, and migration copy.
- GitHub release, npm dist-tag, plugin publication, and announcement gates are
mapped to fresh command evidence.
- Release notes, migration guide, known issues, quickstart, X thread, LinkedIn
post, and GitHub release copy are ready but not posted before release URLs
exist.
- Plugin publication/contact paths for Claude and Codex are documented with
owner, required artifacts, and submission status.
### 2. Harness Adapter Compliance Matrix And Scorecard Onramp
Target: 2026-05-31
Acceptance:
- Adapter matrix covers Claude Code, Codex, OpenCode, Cursor, Gemini,
Zed-adjacent surfaces, dmux, Orca, Superset, Ghast, and terminal-only use.
- Each adapter has supported assets, unsupported surfaces, install path,
verification command, and risk notes.
- Harness audit remains 70/70 and gains a public onramp that explains how teams
use the scorecard.
- Reference findings are converted into concrete adapter, observability, or
operator-surface deltas.
### 3. Local Observability, HUD/Status, And Session Control Plane
Target: 2026-06-07
Acceptance:
- Observability readiness remains 14/14 and is backed by JSONL traces, status
snapshots, risk ledger, and exportable handoff contracts.
- HUD/status model covers context, tool calls, active agents, todos, checks,
cost, risk, and queue state.
- Worktree/session controls cover create, resume, status, stop, diff, PR,
merge queue, and conflict queue.
- Linear/GitHub/handoff sync model is explicit enough for real-time progress
tracking.
### 4. Self-Improving Harness Evaluation Loop
Target: 2026-06-10
Acceptance:
- Scenario specs, verifier contracts, traces, playbooks, and regression gates
are documented and at least one read-only prototype exists.
- The loop separates observation, proposal, verification, and promotion.
- Team and individual setups can be scored and improved without blindly
mutating configs.
- RAG/reference-set design covers vetted ECC patterns, team history, CI
failures, diffs, review outcomes, and harness config quality.
### 5. AgentShield Enterprise Security Platform
Target: 2026-06-14
Acceptance:
- Formal policy schema exists for org baselines, exceptions, owners,
expiration, severity, and audit trails.
- SARIF/code-scanning output is implemented and tested.
- Policy packs are defined for OSS, team, enterprise, regulated, high-risk
hooks/MCP, and CI enforcement.
- Supply-chain intelligence plan covers MCP package provenance, npm/pip
reputation, CVEs, typosquats, and dependency risk.
- Prompt-injection corpus and regression benchmark are ready for continuous
rule hardening.
- Enterprise reports include JSON plus HTML/PDF or equivalent executive output.
### 6. ECC Tools Billing, Deep Analysis, PR Checks, And Linear Sync
Target: 2026-06-21
Acceptance:
- Native GitHub Marketplace billing announcement is backed by verified
implementation and docs.
- Billing audit covers plan limits, seats, org/account mapping, subscription
state, overage hooks, and failure modes.
- Deep analyzer covers diff patterns, CI/CD workflows, dependency/security
surface, PR review behavior, failure history, harness config, skill quality,
and reference-set/RAG comparison.
- PR check suite taxonomy includes Security Evidence, Harness Drift, Install
Manifest Integrity, CI/CD Recommendation, Cost/Token Risk, and Agent Config
Review.
- Linear sync design maps findings to issues/status without flooding the
workspace.
### 7. Legacy Audit And Stale-Work Salvage Closure
Target: 2026-06-15
Acceptance:
- Legacy directories and orphaned handoffs are inventoried.
- Each useful artifact is marked landed, Linear/project-tracked, salvage
branch, or archive/no-action.
- Stale PR salvage policy stays in force: close stale/conflicted PRs first,
then port useful compatible content on maintainer branches with attribution.
- #1687 localization leftovers are handled only by translator/manual review,
not blind cherry-pick.
## Next Engineering Slices
1. Add the harness adapter compliance matrix and public scorecard onramp.
2. Add the release/name/plugin publication checklist with evidence fields.
3. Start AgentShield enterprise policy schema and SARIF implementation in the
AgentShield repo.
4. Audit ECC Tools billing and check-run surfaces before any native GitHub
payments announcement.
5. Inventory `_legacy-documents-*` and map useful artifacts to landed,
milestone-tracked, salvage, or archive states.

View File

@ -2,6 +2,9 @@
Research summary from competitor/reference analysis (2026-03-22). Research summary from competitor/reference analysis (2026-03-22).
For the current GA execution roadmap and Linear milestone mirror, see
[`ECC-2.0-GA-ROADMAP.md`](ECC-2.0-GA-ROADMAP.md).
## Competitive Landscape ## Competitive Landscape
| Project | Stars | Language | Type | Multi-Agent | Worktrees | Terminal-native | | Project | Stars | Language | Type | Multi-Agent | Worktrees | Terminal-native |

View File

@ -3,6 +3,7 @@
## Repo ## Repo
- verify local `main` is synced to `origin/main` - verify local `main` is synced to `origin/main`
- verify `docs/ECC-2.0-GA-ROADMAP.md` reflects the current Linear milestone plan
- verify `docs/HERMES-SETUP.md` is present - verify `docs/HERMES-SETUP.md` is present
- verify `docs/architecture/cross-harness.md` is present - verify `docs/architecture/cross-harness.md` is present
- verify this release directory is committed - verify this release directory is committed