# ECC Operator Readiness Dashboard This dashboard is generated by `npm run operator:dashboard`. It is an operator snapshot, not release approval. Generated: 2026-05-18T01:50:19.099Z Commit: 000df72d6b9c5b11feb11deef609911943b48424 Status: work remaining ## Current Status | Area | Status | Evidence | | --- | --- | --- | | PR queue | Current | 0 open PRs across tracked repos | | Issue queue | Current | 0 open issues across tracked repos | | Discussions | Current | 0 need maintainer touch; 0 missing accepted answer | | Local worktree | Current | 0 blocking dirty files; 1 ignored dirty entries | | Dashboard generation | Current | platform audit ready: true; GitHub skipped: false | | Publication | Not complete | release, npm, plugin, billing, and announcement gates are tracked below | ## Prompt-To-Artifact Checklist | Objective requirement | Artifact or gate | Status | Evidence | Gap | | --- | --- | --- | --- | --- | | Keep public PRs below 20 | scripts/platform-audit.js live GitHub sweep | current | 0 open PRs across 5 tracked repos | repeat before release | | Keep public issues below 20 | scripts/platform-audit.js live GitHub sweep | current | 0 open issues across 5 tracked repos | repeat before release | | Respond and manage repository discussions | scripts/platform-audit.js discussion summary | current | 0 need maintainer touch; 0 answerable discussions missing accepted answer | repeat before release | | Build ITO-44 completion dashboard into a repeatable command | npm run operator:dashboard | complete | operator:dashboard package script exists | keep generated dashboard attached to publication evidence | | ECC 2.0 preview pack ready | docs/releases/2.0.0-rc.1/preview-pack-manifest.md | current | preview pack manifest and deterministic smoke gate are in-tree | repeat clean-checkout preview-pack smoke before publication | | Include Hermes specialized skills safely | docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md | current | Hermes setup/import artifacts are covered by preview-pack smoke | repeat preview-pack smoke before release review | | Prepare name-change, Claude plugin, and Codex plugin paths | naming-and-publication-matrix plus publication-readiness | in_progress | naming matrix and plugin readiness gates exist | real tag/push, marketplace submission, and final channel choice remain approval-gated | | Prepare release notes, articles, tweets, and push notifications | docs/releases/2.0.0-rc.1 social and release-copy files | in_progress | release notes, X thread, and LinkedIn draft are present | URL-backed refresh and publish approval still pending | | Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield policy promotion `reviewItems` landed in `87aec47`; package-manager hardening drift detection landed in `28d08c7`; workflow action runtime pins were refreshed in `659f569`; npm age-gate guidance was corrected in `ee585cd`; package-manager hardening Action outputs landed in `1124535`; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in `1593925`; ECC-Tools consumes those outputs in `8658951`, surfaces operator-readable status/pack/count/digest telemetry in `16c537f`, and renders hosted promotion judge audit traces in `05d4e82`; all are mirrored in the GA roadmap | deepen live operator approval/readback after Marketplace/payment gates | | Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, billing announcement preflight, and production KV readback state are mirrored in the GA roadmap | complete Marketplace purchase/webhook readback, then run the live announcement gate | | Audit, prune, or attach legacy work | docs/stale-pr-salvage-ledger.md and legacy inventory | current | legacy salvage ledger and inventory are current; all localization tails are attached to Linear ITO-55 for manual language-owner review | repeat legacy scan before release | | Keep Linear roadmap detailed and progress tracking synchronized | Linear project mirror plus progress-sync contract | current | Linear live sync and project progress snapshot are current; progress-sync contract defines the file-backed work-items/status path | repeat Linear/project status update and local work-items sync after each significant merge batch | | Provide ECC 2.0 observability for self-use | observability readiness gate | complete | observability:ready command and readiness doc exist | runtime/dashboard implementation can continue after release gates | | Keep Mini Shai-Hulud/TanStack protection loop current | supply-chain watch plus runbook plus AgentShield package-manager hardening | current | scheduled supply-chain watch emits IOC/advisory-source refresh artifacts; ECC scanner covers gh-token-monitor token-store persistence; AgentShield now detects known AI-tool persistence IOCs, npm lifecycle/token drift, unsupported npm age-key drift, and pnpm/Yarn cooldown drift; ITO-57 has May 17 Linear evidence updates | repeat advisory/source refresh and Linear sync after each significant supply-chain batch | ## Top Actions - `naming-and-plugin-publication`: real tag/push, marketplace submission, and final channel choice remain approval-gated - `release-notes-and-notifications`: URL-backed refresh and publish approval still pending - `agentshield-enterprise-iteration`: deepen live operator approval/readback after Marketplace/payment gates - `ecc-tools-next-level`: complete Marketplace purchase/webhook readback, then run the live announcement gate ## Next Work Order 1. Regenerate this dashboard from the final release commit before publication evidence is recorded. 2. Repeat ITO-57 Linear/project status sync after the next significant merge batch or advisory-source refresh. 3. Complete ECC Tools Marketplace purchase/webhook readback, then run preflight and the live announcement gate before publishing native-payments copy. 4. Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.