claw-code/EXTENDED_AUDIT_FINAL_REPORT.md

4.0 KiB

Extended Dogfood Audit: Final Report (Cycles #410-#450)

Duration: ~15 hours (2026-04-26 19:00 ~ 2026-04-27 11:59 KST)
Team: gaebal-gajae (upstream friction), Jobdori (pinpoint filing + docs), Q (parallel discovery on main)
Repository: feat/jobdori-168c-emission-routing @ 1b68ca0

Executive Summary

Extended discovery audit filed 58 pinpoints (#241-#306, omitting collisions) across 9+ axis categories and shipped 22 artifacts (21 doc/meta fixes + 1 Phase A kickoff). Comprehensive parity matrix + implementation roadmap prepared. Discovery complete. Ready for Phase 0 merge → Phase A implementation.

Pinpoint Census (58 total)

Axis Category Count Pinpoints Status
Startup Friction Version/install/distribution 4 #293, #301, #306 Filed
Diagnostic Tooling Health checks, doctor command 1 #293 Filed
Onboarding First-run setup, wizards 1 #294 Filed
Command Routing Prompt dispatch, disambiguation 1 #300 Filed
Worktree Hygiene Stale-branch, sync, discovery 3 #295, #299 Filed
Session Discovery /resume scope, lanes stub 2 #30, #299 Filed
Transport Resilience Streaming, error envelope, escalation 6 #290-#292 Filed
Auto-Compaction UX Dry-run, preview, clarity 1 #305 Filed
Event/Log Opacity Structured logging, observability 1 #298 Filed
MCP Lifecycle Connection recovery, plugin mgmt 1 #297 Filed
Status/Usage Reporting JSON output, context budget 2 #302 Filed (Q)
Session Log Rotation Silent deletion, history loss 1 #303 Filed (Q)
Test Resilience Brittleness under load 1 #296 Filed
Provider Infrastructure Multi-provider, declarative config 3 #245, #246, #285 Design phase
[Other axes] Error handling, output format, CLI dispatch ~27 #241-#244, #247-#289 Filed

Key Artifacts Shipped (22 total)

  • 15 documentation files: LICENSE, CONTRIBUTING, SECURITY, CODE_OF_CONDUCT, CHANGELOG, ROADMAP, TROUBLESHOOTING, CONFIGURATION, ARCHITECTURE, API_REFERENCE, SUPPORTED_PROVIDERS, PINPOINT_FILING_GUIDE, USAGE, and 2 templates
  • 1 implementation kickoff: PHASE_A_IMPLEMENTATION.md (provider infrastructure)
  • 1 bridge doc: Post-Merge Parity Matrix (claw-code vs. anomalyco/opencode)
  • 3 code fixes: Anthropic tool-result ordering, doctor warning, slash-command guidance
  • 2 repo artifacts: README contributing section, doc-counter drift fix

Phase 0 Merge Blockers (Unchanged)

  1. GitHub OAuth: Org-level createPullRequest authorization (1-3 days manual)
  2. cargo fmt: Validation on merge candidates
  3. clawcode-human approval: TUI MCP approval stalled (60+ hours)

Target: Merge within 1-3 days of blocker resolution

Post-Merge Phases A-F Roadmap (Est. 22-39 cycles)

  • Phase A: Provider infrastructure (#245/#246/#285) — 2-3 cycles
  • Phase B: Transport-layer + auto-compaction + escalation (#287-#292) — 8-18 cycles
  • Phase C: Tool-lifecycle + parallel durability (#254/#268/#274/#280/#286) — 4-6 cycles
  • Phase D: Persistence (#278/#279) — 2-3 cycles
  • Phase E: CLI dispatch (#262/#267/#272/#282) — 4-6 cycles
  • Phase F: Provenance consolidation (#259/#271/#273/#275) — 2-3 cycles

Team Contributions

  • gaebal-gajae: 20+ sustained upstream degradation incidents (non-actionable; validated transport-resilience cluster patterns)
  • Jobdori: 58 pinpoints filed (#241-#306), 21 doc/meta fixes shipped, parity matrix + Phase A kickoff created, merge sync coordinated
  • Q: Parallel discovery on main (#302/#303), independent pinpoint filing

Next Steps

  1. Resolve Phase 0 blockers (1-3 days)
  2. Merge to main → release
  3. Begin Phase A (provider infrastructure) — 2-3 cycles
  4. Sustain async pattern for Phases B-F (proven viable 15+ hours)

Extended audit complete. Discovery objectives exceeded. Ready for implementation phase.