mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-18 21:31:15 +08:00
6.2 KiB
6.2 KiB
ECC Operator Readiness Dashboard
This dashboard is generated by npm run operator:dashboard. It is an operator snapshot, not release approval.
Generated: 2026-05-17T19:40:39.634Z
Commit: 822ed726a8
Status: work remaining
Current Status
| Area | Status | Evidence |
|---|---|---|
| PR queue | Current | 0 open PRs across tracked repos |
| Issue queue | Current | 0 open issues across tracked repos |
| Discussions | Current | 0 need maintainer touch; 0 missing accepted answer |
| Local worktree | Current | 0 blocking dirty files; 1 ignored dirty entries |
| Dashboard generation | Current | platform audit ready: true; GitHub skipped: false |
| Publication | Not complete | release, npm, plugin, billing, and announcement gates are tracked below |
Prompt-To-Artifact Checklist
| Objective requirement | Artifact or gate | Status | Evidence | Gap |
|---|---|---|---|---|
| Keep public PRs below 20 | scripts/platform-audit.js live GitHub sweep | current | 0 open PRs across 5 tracked repos | repeat before release |
| Keep public issues below 20 | scripts/platform-audit.js live GitHub sweep | current | 0 open issues across 5 tracked repos | repeat before release |
| Respond and manage repository discussions | scripts/platform-audit.js discussion summary | current | 0 need maintainer touch; 0 answerable discussions missing accepted answer | repeat before release |
| Build ITO-44 completion dashboard into a repeatable command | npm run operator:dashboard | complete | operator:dashboard package script exists | keep generated dashboard attached to publication evidence |
| ECC 2.0 preview pack ready | docs/releases/2.0.0-rc.1/preview-pack-manifest.md | current | preview pack manifest and deterministic smoke gate are in-tree | repeat clean-checkout preview-pack smoke before publication |
| Include Hermes specialized skills safely | docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md | current | Hermes setup/import artifacts are covered by preview-pack smoke | repeat preview-pack smoke before release review |
| Prepare name-change, Claude plugin, and Codex plugin paths | naming-and-publication-matrix plus publication-readiness | in_progress | naming matrix and plugin readiness gates exist | real tag/push, marketplace submission, and final channel choice remain approval-gated |
| Prepare release notes, articles, tweets, and push notifications | docs/releases/2.0.0-rc.1 social and release-copy files | in_progress | release notes, X thread, and LinkedIn draft are present | URL-backed refresh and publish approval still pending |
| Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield policy promotion reviewItems landed in 87aec47; package-manager hardening drift detection landed in 28d08c7; workflow action runtime pins were refreshed in 659f569; npm age-gate guidance was corrected in ee585cd; package-manager hardening Action outputs landed in 1124535; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in 1593925; ECC-Tools consumes those outputs in 8658951, surfaces operator-readable status/pack/count/digest telemetry in 16c537f, and renders hosted promotion judge audit traces in 05d4e82; all are mirrored in the GA roadmap |
deepen live operator approval/readback after Marketplace/payment gates |
| Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, billing announcement preflight, and production KV readback state are mirrored in the GA roadmap | complete Marketplace purchase/webhook readback, then run the live announcement gate |
| Audit, prune, or attach legacy work | docs/stale-pr-salvage-ledger.md and legacy inventory | current | legacy salvage ledger and inventory are current; all localization tails are attached to Linear ITO-55 for manual language-owner review | repeat legacy scan before release |
| Keep Linear roadmap detailed and progress tracking synchronized | Linear project mirror plus progress-sync contract | current | Linear live sync and project progress snapshot are current; progress-sync contract defines the file-backed work-items/status path | repeat Linear/project status update and local work-items sync after each significant merge batch |
| Provide ECC 2.0 observability for self-use | observability readiness gate | complete | observability:ready command and readiness doc exist | runtime/dashboard implementation can continue after release gates |
| Keep Mini Shai-Hulud/TanStack protection loop current | supply-chain watch plus runbook plus AgentShield package-manager hardening | current | scheduled supply-chain watch emits IOC/advisory-source refresh artifacts; AgentShield now detects known AI-tool persistence IOCs, npm lifecycle/token drift, unsupported npm age-key drift, and pnpm/Yarn cooldown drift; ITO-57 has May 17 Linear evidence updates | repeat advisory/source refresh and Linear sync after each significant supply-chain batch |
Top Actions
naming-and-plugin-publication: real tag/push, marketplace submission, and final channel choice remain approval-gatedrelease-notes-and-notifications: URL-backed refresh and publish approval still pendingagentshield-enterprise-iteration: deepen live operator approval/readback after Marketplace/payment gatesecc-tools-next-level: complete Marketplace purchase/webhook readback, then run the live announcement gate
Next Work Order
- Regenerate this dashboard from the final release commit before publication evidence is recorded.
- Repeat ITO-57 Linear/project status sync after the next significant merge batch or advisory-source refresh.
- Complete ECC Tools Marketplace purchase/webhook readback, then run preflight and the live announcement gate before publishing native-payments copy.
- Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.