everything-claude-code/docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md
2026-05-17 13:53:20 -04:00

6.3 KiB

ECC Operator Readiness Dashboard

This dashboard is generated by npm run operator:dashboard. It is an operator snapshot, not release approval.

Generated: 2026-05-17T11:40:47.146Z Commit: 744f416997 Status: work remaining

Current Status

Area Status Evidence
PR queue Current 0 open PRs across tracked repos
Issue queue Current 0 open issues across tracked repos
Discussions Current 0 need maintainer touch; 0 missing accepted answer
Local worktree Current 0 blocking dirty files; 1 ignored dirty entries
Dashboard generation Current platform audit ready: true; GitHub skipped: false
Publication Not complete release, npm, plugin, billing, and announcement gates are tracked below

Prompt-To-Artifact Checklist

Objective requirement Artifact or gate Status Evidence Gap
Keep public PRs below 20 scripts/platform-audit.js live GitHub sweep current 0 open PRs across 5 tracked repos repeat before release
Keep public issues below 20 scripts/platform-audit.js live GitHub sweep current 0 open issues across 5 tracked repos repeat before release
Respond and manage repository discussions scripts/platform-audit.js discussion summary current 0 need maintainer touch; 0 answerable discussions missing accepted answer repeat before release
Build ITO-44 completion dashboard into a repeatable command npm run operator:dashboard complete operator:dashboard package script exists keep generated dashboard attached to publication evidence
ECC 2.0 preview pack ready docs/releases/2.0.0-rc.1/preview-pack-manifest.md in_progress preview pack manifest is in-tree final clean-checkout release approval and publish evidence still pending
Include Hermes specialized skills safely docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md in_progress Hermes setup and import skill are present final preview-pack smoke and release review pending
Prepare name-change, Claude plugin, and Codex plugin paths naming-and-publication-matrix plus publication-readiness in_progress naming matrix and plugin readiness gates exist real tag/push, marketplace submission, and final channel choice remain approval-gated
Prepare release notes, articles, tweets, and push notifications docs/releases/2.0.0-rc.1 social and release-copy files in_progress release notes, X thread, and LinkedIn draft are present URL-backed refresh and publish approval still pending
Advance AgentShield enterprise iteration AgentShield PR evidence plus enterprise roadmap in_progress AgentShield policy promotion reviewItems landed in 87aec47; package-manager hardening drift detection landed in 28d08c7; workflow action runtime pins were refreshed in 659f569; npm age-gate guidance was corrected in ee585cd; package-manager hardening Action outputs landed in 1124535; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in 1593925; ECC-Tools consumes those outputs in 8658951, surfaces operator-readable status/pack/count/digest telemetry in 16c537f, and renders hosted promotion judge audit traces in 05d4e82; all are mirrored in the GA roadmap next enterprise slice should deepen live operator approval/readback after Marketplace/payment gates
Advance ECC Tools native payments and AI-native harness-agnostic app ECC Tools PR evidence, billing gate, hosted analysis lanes in_progress billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, and billing announcement preflight are mirrored in the GA roadmap live Marketplace test-account readback pending
Audit, prune, or attach legacy work docs/stale-pr-salvage-ledger.md and legacy inventory in_progress legacy salvage ledger and ITO-55 tracking are present final translation/manual-review tail remains
Keep Linear roadmap detailed and progress tracking synchronized Linear project mirror plus progress-sync contract in_progress repo mirror and progress-sync contract are present recurring Linear status sync and productized realtime sync remain pending
Provide ECC 2.0 observability for self-use observability readiness gate complete observability:ready command and readiness doc exist runtime/dashboard implementation can continue after release gates
Keep Mini Shai-Hulud/TanStack protection loop current supply-chain watch plus runbook plus AgentShield package-manager hardening current scheduled supply-chain watch emits IOC/advisory-source refresh artifacts; AgentShield now detects known AI-tool persistence IOCs, npm lifecycle/token drift, unsupported npm age-key drift, and pnpm/Yarn cooldown drift; ITO-57 has May 17 Linear evidence updates repeat advisory/source refresh and Linear sync after each significant supply-chain batch

Top Actions

  • ecc-preview-pack: final clean-checkout release approval and publish evidence still pending
  • hermes-specialized-skills: final preview-pack smoke and release review pending
  • naming-and-plugin-publication: real tag/push, marketplace submission, and final channel choice remain approval-gated
  • release-notes-and-notifications: URL-backed refresh and publish approval still pending
  • agentshield-enterprise-iteration: deepen live operator approval/readback after Marketplace/payment gates
  • ecc-tools-next-level: live Marketplace test-account readback pending
  • legacy-salvage: final translation/manual-review tail remains
  • linear-roadmap-and-progress: recurring Linear status sync and productized realtime sync remain pending

Next Work Order

  1. Regenerate this dashboard from the final release commit before publication evidence is recorded.
  2. Continue ITO-57 after the next significant supply-chain/advisory-source merge batch.
  3. Advance ECC Tools live Marketplace test-account readback with npm run billing:announcement-gate -- --preflight --account <github-login> before publishing native-payments announcement copy.
  4. Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.