mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-21 23:19:08 +08:00
190 lines
27 KiB
Markdown
190 lines
27 KiB
Markdown
# ECC v2.0.0-rc.1 Publication Evidence - 2026-05-19
|
|
|
|
This is release-readiness evidence only. It does not create a GitHub release,
|
|
npm publication, plugin tag, marketplace submission, billing announcement, or
|
|
social announcement.
|
|
|
|
## Source Commit
|
|
|
|
| Field | Evidence |
|
|
| --- | --- |
|
|
| Upstream main | `30f60710d4e0424fc70d9bbdc105009db141d9d8` |
|
|
| Git remote | `https://github.com/affaan-m/ECC.git` |
|
|
| Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, PR #2002 owner approval dashboard gate refresh, PR #2004 Linear readiness evidence sync, PR #2005 post-PR #2004 evidence refresh, PR #2008 release supply-chain evidence gate fix, PR #2006 per-project Claude Code adapter, PR #2009 continuous-learning project registry hygiene fix, PR #2011 GateGuard quoted git introspection fix, PR #2013 deterministic release approval gate, PR #2017 AgentShield adapter evidence sync, PR #2018 AgentShield Dependabot evidence sync, ECC-Tools #80-#89 hosted observability/readback and Marketplace Pro selected-target batch, AgentShield #94 Zed/VS Code adapter coverage, AgentShield #95 Dependabot alert closure, and PR #2019 Marketplace Pro release-gate sync |
|
|
| Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe |
|
|
|
|
The release operator must repeat all publish-facing checks from the exact final
|
|
release commit with a strictly clean checkout before publishing.
|
|
|
|
## Queue And Discussion State
|
|
|
|
| Surface | Command | Result |
|
|
| --- | --- | --- |
|
|
| Platform audit | `node scripts/platform-audit.js --json` | Ready true; tracked repos report 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, 0 conflicting PRs, and 0 blocking dirty files |
|
|
| Trunk PRs | `gh pr list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` |
|
|
| Trunk issues | `gh issue list --repo affaan-m/ECC --state open --json number,title,url,author --limit 100` | `[]` |
|
|
| Discussion audit through platform audit | `node scripts/platform-audit.js --json` | `affaan-m/ECC` discussions enabled; 60 sampled after #2015 setup-location Q&A was answered and accepted; 0 needing maintainer touch; 0 answerable without accepted answer |
|
|
| Worktree | `git status --short --branch` | `## main...origin/main` |
|
|
|
|
Tracked repositories in the platform audit were:
|
|
|
|
- `affaan-m/ECC`
|
|
- `affaan-m/agentshield`
|
|
- `affaan-m/JARVIS`
|
|
- `ECC-Tools/ECC-Tools`
|
|
- `ECC-Tools/ECC-website`
|
|
|
|
## Merge Batch
|
|
|
|
| Item | Result |
|
|
| --- | --- |
|
|
| PR #1990 | Merged GitHub integration harness-audit scoring and conflict salvage from the earlier unsafe PR lane |
|
|
| PR #1991 | Merged canonical ECC release identity gate across README, plugin/package metadata, OpenCode surfaces, Marketplace metadata, audit defaults, quickstart, release URL ledger, naming/publication matrix, and release tests |
|
|
| PR #1992 | Merged the release video-suite gate, production manifest, validator, package file surface, preview-pack smoke wiring, release-surface tests, and compact CI JSON output |
|
|
| PR #1993 | Merged the partner, sponsor, consulting, conference, podcast, GitHub Discussion, and video CTA pack for the hypergrowth outbound lane |
|
|
| PR #1994 | Merged the May 19 publication-evidence refresh, platform-audit evidence gate, preview-pack smoke evidence gate, and URL/readiness/roadmap references |
|
|
| PR #1995 | Merged the May 19 operator dashboard refresh with the `$1,728/mo` MRR baseline, `$10,000/mo` target, and release/video/outbound top actions |
|
|
| PR #1996 | Merged the primary launch render self-eval gate for duration, size, resolution, video stream, and audio stream checks |
|
|
| PR #1997 | Merged the publish-candidate gate for the primary launch MP4/captions plus five short clips in wide and vertical formats |
|
|
| PR #1998 | Merged the release video visual QA gate for publish candidates and black-frame segment detection |
|
|
| PR #1999 | Merged the operator dashboard refresh that moved the release video suite to current once publish-candidate evidence was recorded |
|
|
| PR #2000 | Merged the suite-count evidence refresh so the platform audit rejects stale local-suite totals |
|
|
| PR #2001 | Merged the final human decision sheet for release, package, plugin, video, billing, social, and outbound approvals; GitHub Actions run `26102500291` completed successfully |
|
|
| PR #2002 | Merged the owner-approval dashboard refresh so the operator dashboard fails closed when the final decision sheet is missing or incomplete; CI passed before merge |
|
|
| PR #2004 | Merged the May 19 Linear readiness evidence sync after PR #2002, including roadmap, dashboard, preview-pack manifest, publication evidence, operator dashboard generator, and release-surface test updates |
|
|
| PR #2005 | Merged the post-PR #2004 evidence refresh, keeping the May 19 readiness ledger, dashboard, roadmap, and release-surface references current on `main` |
|
|
| PR #2008 | Merged the release supply-chain evidence gate fix so platform-audit readiness keeps matching current publication evidence |
|
|
| PR #2006 | Merged the `claude-project` install target for per-project Claude Code adapter support, then fixed the manifest schema enum on top of the feature branch before merge |
|
|
| PR #2009 | Merged the continuous-learning project registry hygiene fix: non-git hook payloads stay global, no-remote linked worktrees migrate to the main worktree project ID, and `instinct-cli.py projects delete`, `merge`, and `gc` provide operator maintenance commands |
|
|
| PR #2011 | Merged the GateGuard read-only git introspection tokenizer fix so quoted `git show` pathspecs with spaces are preserved while quoted shell separators stay outside the bypass |
|
|
| PR #2013 | Merged the deterministic `release:approval-gate` so final publication, package, plugin, video, billing, social, and outbound actions remain blocked until owner decisions and live URL readbacks are complete |
|
|
| PR #2017 | Merged the AgentShield #94 evidence mirror as `906e06406e95742944ccb05065f95a7e4dd4a036`, syncing roadmap, publication evidence, preview-pack manifest, and supply-chain incident-response surfaces after full GitHub CI passed |
|
|
| PR #2018 | Merged the AgentShield #95 Dependabot evidence mirror as `68b4e45145968acd52e68d900f8422061ed7f4a2`, syncing the roadmap, publication evidence, and preview-pack manifest after full PR CI passed |
|
|
| PR #2019 | Merged the Marketplace Pro selected-target release-gate sync as `30f60710d4e0424fc70d9bbdc105009db141d9d8`, updating the roadmap, publication evidence, naming matrix, preview manifest, and operator dashboard after full PR CI passed |
|
|
|
|
## Post-Queue-Zero Sync - 2026-05-19 Late Pass
|
|
|
|
| Surface | Evidence |
|
|
| --- | --- |
|
|
| ECC approval gate | PR #2013 merged as `9819626459a662773be7d0b1c18d82c1316b8c36`; GitHub Actions run `26128749863` completed successfully; `npm run release:approval-gate -- --format json` remains intentionally blocked with digest `ef8f49f727b7`, 4/6 passing, and failures only on owner decisions plus live URL readbacks |
|
|
| ECC platform audit | `node scripts/platform-audit.js --json` at `2026-05-19T22:45:15Z` returned ready true, 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, and 0 dirty blockers across `affaan-m/ECC`, `affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` |
|
|
| ECC-Tools billing hardening | ECC-Tools PR #79 merged as `67ee247ae1b7b50ecc1261ed5d62d65cc8390da8`; preflight and live billing-announcement output now redact account login values to a stable fingerprint while preserving readiness blockers/actions; local validation passed targeted tests, full test suite 678/678, lint, typecheck, manual preflight, and `git diff --check`; post-merge main CI run `26129253509` completed successfully |
|
|
| JARVIS queue drain | JARVIS PR #15 merged the Dependabot `idna` 3.11 to 3.15 security bump as `4b3685d6ee23b4da1f1a7d22281c6b5d6c0a42c7`; PR checks and post-merge CI/CodeQL passed |
|
|
| JARVIS deploy repair | JARVIS PR #16 merged as `4369c34babd21d539c420866da51c7a8365f1c9e`; the deploy workflow no longer uses an invalid job-level `secrets.*` condition, Vercel deploy skips cleanly when secrets are absent, backend image build/push succeeds, and main CI, CodeQL, and Deploy runs `26129539376`, `26129539427`, and `26129539425` completed successfully |
|
|
| Linear roadmap sync | Linear document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`, and issue comments on ITO-44, ITO-50, ITO-54, ITO-56, and ITO-61 record the late-pass queue-zero, release-gate, billing-safety, and progress-sync state. |
|
|
|
|
## May 20 Hosted Observability And AgentShield Adapter Sync
|
|
|
|
| Surface | Evidence |
|
|
| --- | --- |
|
|
| ECC discussion queue | Discussion #2015 was answered and marked accepted with conservative setup guidance: do not install in `C:\`; use a normal workspace; install `ecc@ecc` once through the Claude plugin marketplace; copy only needed rule folders when using manual rules; do not stack plugin plus full manual install. |
|
|
| ECC platform audit | `node scripts/platform-audit.js --json` at `2026-05-20T00:25:38Z` returned ready true with 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, 0 conflicting PRs, and 0 dirty blockers across `affaan-m/ECC`, `affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website`. |
|
|
| ECC platform audit recheck | `npm run platform:audit -- --json` at `2026-05-20T00:42:11Z` returned ready true with 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, 0 conflicting PRs, 0 GitHub errors, and 0 dirty blockers across the same tracked repo set after AgentShield #94 merged. |
|
|
| ECC-Tools #80/#81/#82 | PR #80 merged runtime-receipt failure-reason enforcement as `4efc8cc858022f84c844690f3298633b081c4398`; PR #81 preserved AgentShield fleet approval IDs as `1fbf635f492284f75ba7166c029c39eb8cc15794`; PR #82 rendered those approval IDs in hosted security review comments/check-runs as `7a7b4d096a176ae80b3a2076c09d45601e36013a`. |
|
|
| ECC-Tools #83/#84 | PR #83 merged deterministic Linear external-ID reuse for deferred follow-ups as `b6b107f33961bef18a85fb619f3a976eb5d752dd`; PR #84 merged hosted AgentShield remediation sync to Linear as `73bac7058071c55cb30c6b8ac6db779b3660c02c`. Local validation covered focused route/client tests, typecheck, lint, full ECC-Tools test suite, and whitespace checks before merge; GitHub Verify, Security Audit, and Workers Builds passed. |
|
|
| ECC-Tools #85/#86/#87 | PR #85 merged hosted job observability events as `1637e0f2bfa0a889387f2c20675680ccc5528123`; PR #86 merged hosted status observability readback as `5a9e94d3ff860307c3e7fd9fd065f0de2bd633dd`; PR #87 merged hosted depth-plan observability readback as `508fbc02b63cf1fcb5af2f3624608fa66e53b5d4`. Local validation for the final depth-plan readback slice passed the focused hosted depth-plan route test, full route suite (89/89), typecheck, lint, full ECC-Tools Vitest suite (683/683), and `git diff --check`; GitHub Verify, Security Audit, and Workers Builds passed before merge. |
|
|
| ECC-Tools #88 | PR #88 merged authenticated hosted observability API readback as `c836ac3fb24ed7e2ae38cd61e41c9651ac9c00f8`. `GET /api/analysis/observability` now summarizes hosted events by event type and job for operator/dashboard readback, skips malformed stale KV records, and the deployment runbook includes the production smoke command. Local verification passed typecheck, lint, full ECC-Tools Vitest suite (686/686), and `git diff --check`; GitHub Verify, Security Audit, and Workers Builds passed before merge. |
|
|
| AgentShield #94 | PR #94 merged Zed/VS Code adapter coverage as `4caee27acfadb50a4cd024e738b5c3cbd4b0bb03`. AgentShield now reports Zed and VS Code as first-class harness adapters, discovers `.zed/settings.json`, `.zed/tasks.json`, and `.zed` hook-code files, and flags `.zed/setup.mjs` in the AI-tool persistence IOC rule alongside `.vscode/setup.mjs`. Local verification passed typecheck, lint, focused scanner/rule tests, full `npm test` (1822 tests), `npm run build`, and `git diff --check`; GitHub checks passed across GitGuardian, scan suite, self-scan, self-scan examples, Node 18/20/22 CI, CodeRabbit, and Cubic after rerunning a transient artifact-upload failure. |
|
|
| AgentShield #95 | PR #95 merged the `brace-expansion` Dependabot fix as `25d91f0002214c408da4ceaac7def20bad40ca10`. The lockfile now resolves vulnerable transitive `brace-expansion` 5.x entries to `5.0.6`, local `npm audit --audit-level=moderate` returns 0 vulnerabilities, and `gh api repos/affaan-m/agentshield/dependabot/alerts?state=open` returns `[]`. Local validation passed typecheck, lint, full `npm test` (1822 tests), build, audit, and whitespace checks; GitHub checks passed across Verify Node 18/20/22, self-scan, self-scan examples, Test GitHub Action, GitGuardian, CodeRabbit, and Cubic. |
|
|
| Linear roadmap sync | Linear ITO-54 comment `74dcc101-3be5-4173-be13-62b80d54f569` and ECC Platform Roadmap project comment `348ea8f5-2a2d-46d9-a0fe-ed99653e7fe5` record the May 20 hosted observability status/depth-plan readback batch; Linear comments `291e2a4b-06e3-4672-a057-cdb141478161` and `b2d35de0-ca49-44cb-982a-ddec229e7691` add the #88 observability API readback; Linear ITO-49 comment `faed69dd-35f5-469d-acb5-ddde6a70d6a1` and project comment `70187c1e-d481-4181-b418-09bd65d54b5e` add the #94 AgentShield Zed/VS Code adapter evidence; Linear ITO-49 comment `371fc3e4-611f-4d20-a23f-67db1260b418`, ITO-57 comment `bd06e252-15c1-4256-b667-caa3f64f5968`, and project comment `22c2c388-2fd1-4dea-a939-6141f40c9a21` add the #95 AgentShield Dependabot alert closure; earlier comments on ITO-54, ITO-48, and the project record the #84 hosted remediation sync and #85 hosted observability event emission batches. |
|
|
|
|
## May 20 Marketplace Pro Release-Gate Sync
|
|
|
|
| Surface | Evidence |
|
|
| --- | --- |
|
|
| ECC-Tools #89 | PR #89 merged as `512bca6b99cdaa67058a6aa9a4e7e7f0b1d9873a` after Verify, Security Audit, and Workers Builds passed. It added `billing:kv-readback -- --select-ready-target --require-ready`, allowing operators to select a ready Marketplace Pro target internally without passing or printing the login. |
|
|
| Live production readback | The 2026-05-20 Wrangler OAuth readback found ready-like Marketplace Pro records with webhook provenance, selected a target with both key families, seat and webhook readiness, no overage, and 0 blockers, with account details redacted. The old missing Marketplace Pro target-state blocker is cleared. |
|
|
| ECC #2019 | PR #2019 merged as `30f60710d4e0424fc70d9bbdc105009db141d9d8`, syncing the selected-target readback evidence into the GA roadmap, rc.1 publication evidence, naming matrix, preview manifest, and operator dashboard. |
|
|
| Post-merge main CI | GitHub Actions run `26135974576` completed successfully on `main` for `30f60710d4e0424fc70d9bbdc105009db141d9d8` across lint, coverage, security, validation, and the full OS/package-manager matrix. |
|
|
| Post-merge local gates | `npm run platform:audit -- --json` returned ready true with 0 PRs, 0 issues, 0 discussion gaps, and 0 dirty blockers; `npm run preview-pack:smoke -- --format json` returned ready true with digest `531328aaaa53` before the May 20 dashboard rollover and `eebb8a66c33e` after adding the May 20 dashboard artifact; `git diff --check HEAD~1..HEAD` was clean. |
|
|
| Linear roadmap sync | Linear ITO-61 comment `467d148a-712a-4777-aad9-95593e9f1739` and ECC Platform Roadmap project comment `7642ee9c-3107-400c-a229-53e2895a8914` record ECC-Tools #89, ECC #2019, the green post-merge CI run, and the remaining internal bearer-token gate. |
|
|
| Remaining blocker | Native-payments announcement copy remains blocked until the local/internal `INTERNAL_API_SECRET` bearer-token path is available and `npm run billing:announcement-gate -- --select-ready-target` returns ready for the selected Marketplace Pro target. |
|
|
|
|
## Release And Growth Evidence
|
|
|
|
| Gate | Command | Result |
|
|
| --- | --- | --- |
|
|
| Release-surface tests | `node tests/docs/ecc2-release-surface.test.js` | 28 passed, 0 failed |
|
|
| Preview-pack smoke | `npm run preview-pack:smoke -- --format json` | Ready true; digest `eebb8a66c33e`; 33 required artifacts; 5 passed, 0 failed |
|
|
| Release approval gate | `npm run release:approval-gate -- --format json` | Expected blocked; digest `ef8f49f727b7`; 4 passed, 2 failed; owner decisions and live URL readbacks remain approval-gated |
|
|
| Operator dashboard | `npm run operator:dashboard -- --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-20.md` | Regenerated from the May 20 `main` baseline with platform audit ready true, 0 tracked PRs, 0 tracked issues, 0 discussion gaps, `$1,728/mo` current MRR, `$10,000/mo` target MRR, the release video suite marked current, Linear release-gate sync current, and top actions for plugin publication, notifications, outbound approval, AgentShield, and ECC Tools billing |
|
|
| Supply-chain verification | `npm audit --audit-level=moderate`; `npm audit signatures`; `yarn install --immutable --mode=skip-build` | Current supply-chain refresh found 0 npm vulnerabilities, verified 254 registry signatures and 30 attestations, and accepted the Yarn lock after pinning `@types/node@25.7.0` plus refreshing `brace-expansion` to `5.0.6` / `1.1.14` |
|
|
| Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB |
|
|
| Focused post-merge regression set | `node tests/hooks/detect-project-worktree.test.js`; `node tests/hooks/observe-subdirectory-detection.test.js`; `node tests/scripts/instinct-cli-projects.test.js`; `node tests/hooks/hooks.test.js` | 10/10, 6/6, 5/5, and 237/237 passed after PR #2009 merged |
|
|
| GateGuard PR #2011 regression | `node tests/hooks/gateguard-fact-force.test.js`; `npm test`; `git diff --check main...HEAD` | 91/91 passed on the PR branch; full local suite passed 2560/2560 before merge; whitespace check passed; focused GateGuard suite passed again on current `main` |
|
|
| Release approval gate PR #2013 validation | `npm test`; `npm run lint`; `git diff --check`; `npm run preview-pack:smoke -- --format json`; `npm run release:approval-gate -- --format json` | 2568/2568 tests passed before merge; lint and whitespace passed; preview pack stayed ready with digest `531328aaaa53`; release approval gate returned the expected blocked exit with digest `ef8f49f727b7` |
|
|
| Full local suite | `node tests/run-all.js` | 2568 passed, 0 failed before PR #2013 merge |
|
|
| PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix |
|
|
| PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge |
|
|
| PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge |
|
|
| PR #2002 CI | GitHub Actions run `26103853507` | Completed successfully before merge; required checks passed, Cubic remained non-blocking, and PR #2002 merged into `main` as `c7d662c3c68719e5ef0b5305ca3f6782b3214224` |
|
|
| PR #2004 CI | GitHub Actions run `26105012698` | Completed successfully after rerunning the single failed Windows Node 18 yarn job; required checks passed, Cubic remained non-blocking, and PR #2004 merged into `main` as `ac7434ea8f39166b11e9d06ce64b38c4fb8d9202` |
|
|
| PR #2005 CI | GitHub Actions run `26106321921` | Completed successfully with 37 completed jobs, 0 failed jobs, and PR #2005 merged into `main` as `d6022d6b8dc5ef1393cf18ae40ee58f646f3754e` |
|
|
| PR #2008 CI | GitHub Actions run `26108473648` | Completed successfully across the required matrix before merge; non-blocking Cubic skipped after review |
|
|
| Post-PR #2006 main CI | GitHub Actions run `26109953093` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `98bd517451f38fa0150a53aab4234c2239a47b7e` |
|
|
| PR #2009 CI | GitHub Actions run `26111313938` | Completed successfully with 37 completed jobs, 0 failed jobs after replacing the brittle fake-worktree regression fixture with a real `git worktree add` setup |
|
|
| Post-PR #2009 main CI | GitHub Actions run `26111946778` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `bc519e5b8ed42f26c0a5a611756e04351c323f21` |
|
|
| Post-PR #2011 main CI | GitHub Actions run `26113695068` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `14d88e517b0c56a80c1a6392b1cde2474948d29f` |
|
|
| Post-PR #2013 main CI | GitHub Actions run `26128749863` | Completed successfully with `main` advanced to `9819626459a662773be7d0b1c18d82c1316b8c36` |
|
|
| Post-PR #2019 main CI | GitHub Actions run `26135974576` | Completed successfully with `main` advanced to `30f60710d4e0424fc70d9bbdc105009db141d9d8` |
|
|
| Linear sync | Linear document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` plus project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`; late-pass document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f` plus project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`; May 20 ITO-61 comment `467d148a-712a-4777-aad9-95593e9f1739` plus project comment `7642ee9c-3107-400c-a229-53e2895a8914` | Project and issue lanes record PR #2002 evidence, discussion #2003 routing, owner-approval dashboard gate, and In Progress status for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; the late-pass sync attaches PR #2013, ECC-Tools #79, and JARVIS #15/#16 evidence to ITO-44, ITO-50, ITO-54, ITO-56, and ITO-61; the May 20 sync attaches ECC-Tools #89 and ECC #2019 Marketplace Pro selected-target evidence to ITO-61 and the project |
|
|
| Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed |
|
|
| Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed |
|
|
|
|
## Product And Positioning Evidence
|
|
|
|
| Surface | Evidence |
|
|
| --- | --- |
|
|
| Canonical repo identity | Public URLs and release docs now use `https://github.com/affaan-m/ECC` where public links are needed |
|
|
| Release claim | Release notes and launch collateral frame ECC as the harness-native operator system for agentic work, not a Claude-only config pack |
|
|
| Video proof | `video-suite-production.md` gates the local rough render, timeline, captions, source inventory, publish-candidate clip set, self-eval, black-frame QA, and no-private-path publication rules |
|
|
| Growth proof | `partner-sponsor-talks-pack.md` provides approval-gated copy for sponsors, partners, consulting, talks, podcasts, GitHub Discussion, and video CTAs |
|
|
| Owner approval proof | `owner-approval-packet-2026-05-19.md` centralizes release, package, plugin, video, billing, social, and outbound decision gates |
|
|
| Business baseline | Hypergrowth command center and partner pack use `$1,728/mo` current MRR, `$10,000/mo` target MRR, and `$8,272/mo` gap |
|
|
| Operator dashboard | `operator-readiness-dashboard-2026-05-19.md` pulls the growth baseline into the same queue, publication, video, outbound, AgentShield, ECC Tools, Linear, and supply-chain control surface |
|
|
| Linear progress proof | Linear project document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` mirrors the post-PR #2002 state and records active lanes for launch materials, AgentShield, ECC Tools deep analysis, observability, and final release publication; Linear document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f` adds the PR #2013 approval gate, ECC-Tools #79 redaction hardening, and JARVIS #15/#16 queue/deploy repair evidence; May 20 Linear comments `74dcc101-3be5-4173-be13-62b80d54f569`, `348ea8f5-2a2d-46d9-a0fe-ed99653e7fe5`, `291e2a4b-06e3-4672-a057-cdb141478161`, `b2d35de0-ca49-44cb-982a-ddec229e7691`, `faed69dd-35f5-469d-acb5-ddde6a70d6a1`, `70187c1e-d481-4181-b418-09bd65d54b5e`, `371fc3e4-611f-4d20-a23f-67db1260b418`, `bd06e252-15c1-4256-b667-caa3f64f5968`, and `22c2c388-2fd1-4dea-a939-6141f40c9a21` add ECC-Tools #86/#87/#88 hosted observability readback evidence, AgentShield #94 adapter evidence, and AgentShield #95 Dependabot alert closure to ITO-54, ITO-49, ITO-57, and the project |
|
|
|
|
## Current Publication Blockers
|
|
|
|
- GitHub prerelease `v2.0.0-rc.1` is still not created in this pass.
|
|
- npm `ecc-universal@2.0.0-rc.1` is still not published to the `next`
|
|
dist-tag.
|
|
- Claude plugin tag and marketplace propagation remain approval-gated.
|
|
- Codex repo-marketplace distribution is verified by prior evidence, but
|
|
official Plugin Directory publishing remains blocked on OpenAI submission or
|
|
listing evidence.
|
|
- ECC Tools billing/native-payments copy remains blocked until the
|
|
local/internal `INTERNAL_API_SECRET` bearer-token path is available and the
|
|
live `billing:announcement-gate -- --select-ready-target` check passes.
|
|
ECC-Tools PR #89 (`512bca6`) added `billing:kv-readback --
|
|
--select-ready-target --require-ready`; its 2026-05-20 production run cleared
|
|
the old missing-target-state blocker without printing the account login.
|
|
ECC-Tools PR #90 (`16a5bb3`) added the selected-target official announcement
|
|
gate, so production preflight no longer needs a raw GitHub login and now
|
|
blocks only on the missing `INTERNAL_API_SECRET` input before live execution.
|
|
- Release notes, X, LinkedIn, GitHub release, GitHub Discussion, longform copy,
|
|
sponsor outreach, partner outreach, consulting copy, conference pitches, and
|
|
podcast pitches still need final live URLs plus human approval before posting
|
|
or sending.
|
|
- Discord/community links still need a real invite or bot/guild credential path
|
|
before public docs should route users there.
|
|
|
|
## Result
|
|
|
|
The tracked public PR queue, issue queue, discussion queue, canonical ECC
|
|
identity, release video suite, preview pack, growth outreach packet, per-project
|
|
Claude Code adapter surface, continuous-learning project registry hygiene,
|
|
GateGuard quoted git introspection fix, deterministic release approval gate,
|
|
ECC-Tools billing-announcement redaction hardening, ECC-Tools hosted
|
|
observability readback, AgentShield Zed/VS Code adapter coverage, AgentShield
|
|
Dependabot alert closure, and JARVIS
|
|
security/deploy queue repairs are current on May 20, 2026 for ECC `main`
|
|
through `906e06406e95742944ccb05065f95a7e4dd4a036`, ECC-Tools `main`
|
|
through `c836ac3fb24ed7e2ae38cd61e41c9651ac9c00f8`, and AgentShield `main`
|
|
through `25d91f0002214c408da4ceaac7def20bad40ca10`. The remaining video work is owner
|
|
approval, upload, and public URL attachment, not render or QA production.
|
|
|
|
This improves publication readiness but does not replace the approval-gated
|
|
release, package, plugin, billing, Discord, and announcement steps in
|
|
`publication-readiness.md`.
|