everything-claude-code/docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-15.md
2026-05-17 01:31:30 -04:00

5.5 KiB

ECC Operator Readiness Dashboard

This dashboard is generated by npm run operator:dashboard. It is an operator snapshot, not release approval.

Generated: 2026-05-17T05:08:31.916Z Commit: 6d130cfcd5 Status: work remaining

Current Status

Area Status Evidence
PR queue Current 6 open PRs across tracked repos
Issue queue Current 3 open issues across tracked repos
Discussions Current 0 need maintainer touch; 0 missing accepted answer
Local worktree Needs work 7 blocking dirty files; 1 ignored dirty entries
Dashboard generation Current platform audit ready: true; GitHub skipped: false
Publication Not complete release, npm, plugin, billing, and announcement gates are tracked below

Prompt-To-Artifact Checklist

Objective requirement Artifact or gate Status Evidence Gap
Keep public PRs below 20 scripts/platform-audit.js live GitHub sweep current 6 open PRs across 5 tracked repos repeat before release
Keep public issues below 20 scripts/platform-audit.js live GitHub sweep current 3 open issues across 5 tracked repos repeat before release
Respond and manage repository discussions scripts/platform-audit.js discussion summary current 0 need maintainer touch; 0 answerable discussions missing accepted answer repeat before release
Build ITO-44 completion dashboard into a repeatable command npm run operator:dashboard complete operator:dashboard package script exists keep generated dashboard attached to publication evidence
ECC 2.0 preview pack ready docs/releases/2.0.0-rc.1/preview-pack-manifest.md in_progress preview pack manifest is in-tree final clean-checkout release approval and publish evidence still pending
Include Hermes specialized skills safely docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md in_progress Hermes setup and import skill are present final preview-pack smoke and release review pending
Prepare name-change, Claude plugin, and Codex plugin paths naming-and-publication-matrix plus publication-readiness in_progress naming matrix and plugin readiness gates exist real tag/push, marketplace submission, and final channel choice remain approval-gated
Prepare release notes, articles, tweets, and push notifications docs/releases/2.0.0-rc.1 social and release-copy files in_progress release notes, X thread, and LinkedIn draft are present URL-backed refresh and publish approval still pending
Advance AgentShield enterprise iteration AgentShield PR evidence plus enterprise roadmap in_progress AgentShield enterprise PR evidence is mirrored in the GA roadmap workflow automation around protected rollout and richer runtime review UX pending after policy promotion shipped
Advance ECC Tools native payments and AI-native harness-agnostic app ECC Tools PR evidence, billing gate, hosted analysis lanes in_progress billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, and harness-route policy linking are mirrored in the GA roadmap live Marketplace test-account readback, hosted promotion telemetry, and richer operator review UX pending
Audit, prune, or attach legacy work docs/stale-pr-salvage-ledger.md and legacy inventory in_progress legacy salvage ledger and ITO-55 tracking are present final translation/manual-review tail remains
Keep Linear roadmap detailed and progress tracking synchronized Linear project mirror plus progress-sync contract in_progress repo mirror and progress-sync contract are present recurring Linear status sync and productized realtime sync remain pending
Provide ECC 2.0 observability for self-use observability readiness gate complete observability:ready command and readiness doc exist runtime/dashboard implementation can continue after release gates
Keep Mini Shai-Hulud/TanStack protection loop current supply-chain watch plus runbook current scheduled supply-chain watch now emits IOC and advisory-source refresh artifacts Linear status synchronization remains ITO-57 follow-up after each significant merge batch

Top Actions

  • ecc-preview-pack: final clean-checkout release approval and publish evidence still pending
  • hermes-specialized-skills: final preview-pack smoke and release review pending
  • naming-and-plugin-publication: real tag/push, marketplace submission, and final channel choice remain approval-gated
  • release-notes-and-notifications: URL-backed refresh and publish approval still pending
  • agentshield-enterprise-iteration: workflow automation around protected rollout and richer runtime review UX pending after policy promotion shipped
  • ecc-tools-next-level: live Marketplace test-account readback, hosted promotion telemetry, and richer operator review UX pending
  • legacy-salvage: final translation/manual-review tail remains
  • linear-roadmap-and-progress: recurring Linear status sync and productized realtime sync remain pending

Next Work Order

  1. Regenerate this dashboard from the final release commit before publication evidence is recorded.
  2. Continue ITO-57 with Linear status synchronization for the scheduled supply-chain watch advisory-source report.
  3. Advance ECC Tools live Marketplace test-account readback before publishing native-payments announcement copy.
  4. Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.