mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-18 21:31:15 +08:00
5.5 KiB
5.5 KiB
ECC Operator Readiness Dashboard
This dashboard is generated by npm run operator:dashboard. It is an operator snapshot, not release approval.
Generated: 2026-05-17T05:08:31.916Z
Commit: 6d130cfcd5
Status: work remaining
Current Status
| Area | Status | Evidence |
|---|---|---|
| PR queue | Current | 6 open PRs across tracked repos |
| Issue queue | Current | 3 open issues across tracked repos |
| Discussions | Current | 0 need maintainer touch; 0 missing accepted answer |
| Local worktree | Needs work | 7 blocking dirty files; 1 ignored dirty entries |
| Dashboard generation | Current | platform audit ready: true; GitHub skipped: false |
| Publication | Not complete | release, npm, plugin, billing, and announcement gates are tracked below |
Prompt-To-Artifact Checklist
| Objective requirement | Artifact or gate | Status | Evidence | Gap |
|---|---|---|---|---|
| Keep public PRs below 20 | scripts/platform-audit.js live GitHub sweep | current | 6 open PRs across 5 tracked repos | repeat before release |
| Keep public issues below 20 | scripts/platform-audit.js live GitHub sweep | current | 3 open issues across 5 tracked repos | repeat before release |
| Respond and manage repository discussions | scripts/platform-audit.js discussion summary | current | 0 need maintainer touch; 0 answerable discussions missing accepted answer | repeat before release |
| Build ITO-44 completion dashboard into a repeatable command | npm run operator:dashboard | complete | operator:dashboard package script exists | keep generated dashboard attached to publication evidence |
| ECC 2.0 preview pack ready | docs/releases/2.0.0-rc.1/preview-pack-manifest.md | in_progress | preview pack manifest is in-tree | final clean-checkout release approval and publish evidence still pending |
| Include Hermes specialized skills safely | docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md | in_progress | Hermes setup and import skill are present | final preview-pack smoke and release review pending |
| Prepare name-change, Claude plugin, and Codex plugin paths | naming-and-publication-matrix plus publication-readiness | in_progress | naming matrix and plugin readiness gates exist | real tag/push, marketplace submission, and final channel choice remain approval-gated |
| Prepare release notes, articles, tweets, and push notifications | docs/releases/2.0.0-rc.1 social and release-copy files | in_progress | release notes, X thread, and LinkedIn draft are present | URL-backed refresh and publish approval still pending |
| Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield enterprise PR evidence is mirrored in the GA roadmap | workflow automation around protected rollout and richer runtime review UX pending after policy promotion shipped |
| Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, and harness-route policy linking are mirrored in the GA roadmap | live Marketplace test-account readback, hosted promotion telemetry, and richer operator review UX pending |
| Audit, prune, or attach legacy work | docs/stale-pr-salvage-ledger.md and legacy inventory | in_progress | legacy salvage ledger and ITO-55 tracking are present | final translation/manual-review tail remains |
| Keep Linear roadmap detailed and progress tracking synchronized | Linear project mirror plus progress-sync contract | in_progress | repo mirror and progress-sync contract are present | recurring Linear status sync and productized realtime sync remain pending |
| Provide ECC 2.0 observability for self-use | observability readiness gate | complete | observability:ready command and readiness doc exist | runtime/dashboard implementation can continue after release gates |
| Keep Mini Shai-Hulud/TanStack protection loop current | supply-chain watch plus runbook | current | scheduled supply-chain watch now emits IOC and advisory-source refresh artifacts | Linear status synchronization remains ITO-57 follow-up after each significant merge batch |
Top Actions
ecc-preview-pack: final clean-checkout release approval and publish evidence still pendinghermes-specialized-skills: final preview-pack smoke and release review pendingnaming-and-plugin-publication: real tag/push, marketplace submission, and final channel choice remain approval-gatedrelease-notes-and-notifications: URL-backed refresh and publish approval still pendingagentshield-enterprise-iteration: workflow automation around protected rollout and richer runtime review UX pending after policy promotion shippedecc-tools-next-level: live Marketplace test-account readback, hosted promotion telemetry, and richer operator review UX pendinglegacy-salvage: final translation/manual-review tail remainslinear-roadmap-and-progress: recurring Linear status sync and productized realtime sync remain pending
Next Work Order
- Regenerate this dashboard from the final release commit before publication evidence is recorded.
- Continue ITO-57 with Linear status synchronization for the scheduled supply-chain watch advisory-source report.
- Advance ECC Tools live Marketplace test-account readback before publishing native-payments announcement copy.
- Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.