everything-claude-code/docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-15.md

5.3 KiB

ECC Operator Readiness Dashboard

This dashboard is generated by npm run operator:dashboard. It is an operator snapshot, not release approval.

Generated: 2026-05-16T04:28:24.202Z Commit: 1eb7b0809d Status: work remaining

Current Status

Area Status Evidence
PR queue Current 0 open PRs across tracked repos
Issue queue Current 0 open issues across tracked repos
Discussions Current 0 need maintainer touch; 0 missing accepted answer
Local worktree Current 0 blocking dirty files; 1 ignored dirty entries
Dashboard generation Current platform audit ready: true; GitHub skipped: false
Publication Not complete release, npm, plugin, billing, and announcement gates are tracked below

Prompt-To-Artifact Checklist

Objective requirement Artifact or gate Status Evidence Gap
Keep public PRs below 20 scripts/platform-audit.js live GitHub sweep current 0 open PRs across 5 tracked repos repeat before release
Keep public issues below 20 scripts/platform-audit.js live GitHub sweep current 0 open issues across 5 tracked repos repeat before release
Respond and manage repository discussions scripts/platform-audit.js discussion summary current 0 need maintainer touch; 0 answerable discussions missing accepted answer repeat before release
Build ITO-44 completion dashboard into a repeatable command npm run operator:dashboard complete operator:dashboard package script exists keep generated dashboard attached to publication evidence
ECC 2.0 preview pack ready docs/releases/2.0.0-rc.1/preview-pack-manifest.md in_progress preview pack manifest is in-tree final clean-checkout release approval and publish evidence still pending
Include Hermes specialized skills safely docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md in_progress Hermes setup and import skill are present final preview-pack smoke and release review pending
Prepare name-change, Claude plugin, and Codex plugin paths naming-and-publication-matrix plus publication-readiness in_progress naming matrix and plugin readiness gates exist real tag/push, marketplace submission, and final channel choice remain approval-gated
Prepare release notes, articles, tweets, and push notifications docs/releases/2.0.0-rc.1 social and release-copy files in_progress release notes, X thread, and LinkedIn draft are present URL-backed refresh and publish approval still pending
Advance AgentShield enterprise iteration AgentShield PR evidence plus enterprise roadmap in_progress AgentShield enterprise PR evidence is mirrored in the GA roadmap cross-harness depth and evidence-pack consumer/readback workflow remain pending
Advance ECC Tools native payments and AI-native harness-agnostic app ECC Tools PR evidence, billing gate, hosted analysis lanes in_progress billing announcement gate and hosted analysis lanes are mirrored in the GA roadmap live Marketplace test-account readback, hosted promotion telemetry, and operator review UX pending
Audit, prune, or attach legacy work docs/stale-pr-salvage-ledger.md and legacy inventory not_complete legacy salvage ledger and ITO-55 tracking are present final translation/manual-review tail remains
Keep Linear roadmap detailed and progress tracking synchronized Linear project mirror plus progress-sync contract in_progress repo mirror and progress-sync contract are present recurring Linear status sync and productized realtime sync remain pending
Provide ECC 2.0 observability for self-use observability readiness gate complete observability:ready command and readiness doc exist runtime/dashboard implementation can continue after release gates
Keep Mini Shai-Hulud/TanStack protection loop current supply-chain watch plus runbook current scheduled supply-chain watch now emits IOC and advisory-source refresh artifacts Linear status synchronization remains ITO-57 follow-up after each significant merge batch

Top Actions

  • ecc-preview-pack: final clean-checkout release approval and publish evidence still pending
  • hermes-specialized-skills: final preview-pack smoke and release review pending
  • naming-and-plugin-publication: real tag/push, marketplace submission, and final channel choice remain approval-gated
  • release-notes-and-notifications: URL-backed refresh and publish approval still pending
  • agentshield-enterprise-iteration: cross-harness depth and evidence-pack consumer/readback workflow remain pending
  • ecc-tools-next-level: live Marketplace test-account readback, hosted promotion telemetry, and operator review UX pending
  • legacy-salvage: final translation/manual-review tail remains
  • linear-roadmap-and-progress: recurring Linear status sync and productized realtime sync remain pending

Next Work Order

  1. Regenerate this dashboard from the final release commit before publication evidence is recorded.
  2. Continue ITO-57 with Linear status synchronization for the scheduled supply-chain watch advisory-source report.
  3. Advance ECC Tools live Marketplace test-account readback before publishing native-payments announcement copy.
  4. Resume ITO-45, ITO-46, and ITO-56 only after the generated dashboard and final release gates are refreshed.